Kenyon City Council, April 8, 2025

The Kenyon City Council met April 8, 2025 with Mayor Donald Kirchmann presiding and Council Member Lee Sjolander absent. Citizens raised three matters: Pat Shea warned of a proposed 300-megawatt wind farm with "60-85 turbines" near Kenyon; Bailey Ament asked to be placed on the May agenda to seek permission for educational chickens in residential areas; and Goodhue County Commissioner Todd Greseth announced the county board's May meeting would be at Kenyon City Hall and that the county budget was "up in the air" pending federal cuts.

7motions
7 unanimousno split votes
4present, absent: Lee Sjolander
1resolutions
$3,104,052largest figure
Yesrecording posted

Watch the meeting

Meeting video, from the city's YouTube channel · open on YouTube
PresentDonald Kirchmann mayorKim HelgesonMary Bailey (arrived at 7:17 p.m.)and Elana Brunner
street and utility improvements special assessments bidding and contracts chip seal liquor licenses liability insurance police hiring citizen comments

What happened

  1. Resolution 2025-12 adopted, declaring cost to be assessed and calling the assessment hearing for the 2025 Street & Utility Improvements at the May council meeting
  2. Six bids received by the April 2, 2025 deadline on the street and utility project; bids still being evaluated, award to follow the assessment hearing
  3. Doug Ims of Icon, LLC objected that the city engineer would not recommend his low bid because of how he bid the job
  4. Chip seal contract awarded to Pearson Bros., with approval to exceed the quote by up to $20,000 to cover 2026 work; low quote was about $60,000 against a $90,000 budget
  5. Council voted to follow past precedent and not waive LMCIT state liability limits ($500,000 per claimant / $1,500,000 per occurrence)
  6. Council authorized Administrator Lehner to negotiate a limited 2025 agreement with Taco Express after the March non-renewal decision
  7. Consent agenda approved checks 77014-77071 and 5383E-5499E plus budget transfers totaling $17,750
  8. Finance Director Kyllo reported IRS and MN Department of Revenue claims from quarter three of 2023 are legitimate and must be paid with penalties
  9. Four candidates applied for the police officer position and were scheduled for interviews April 15
  10. Capital finance planning workshop scheduled for Tuesday, April 29, 2025 at 6:00 p.m.
  11. Citizen Bailey Ament requested a May agenda item to allow educational chickens in residential areas

What was asked 21 raised · 13 settled

Every question, assignment, pending figure and unsourced claim from this meeting, quoted from the record, each checked against the county, census, listing, bid and budget data we hold.

3 answered from our records10 what happened next4 partly answered4 we hold no data
Action itemCouncil Member Helgeson (motion), seconded by Baileyfrom the minutes
Motion by Helgeson seconded by Bailey to award the chip seal contract to Pearson Bros. as written, with additional approval to exceed the total quoted by up to $20,000 as directed by the City Engineer.

Olinger wanted to expand the contract to cover work planned for 2026 while staying under budget.

At the meetingMotion carried 4-0-0.

Answered from our records

The chip seal contract went to Pearson Bros at $59,951.55 with authority to exceed that by up to $20,000 at the City Engineer's direction, for a ceiling of $79,951.55. Pearson beat Asphalt Surface Technologies at $68,726, Allied Blacktop at $69,913.20 and Fahrner at $96,685.70. The final expanded scope amount actually spent is not in our record.

KENYON_BIDS.md, 2025-05-13 entry; data/bids.csv

Unsourced claimEngineer Derek Olingerfrom the minutes
He would like to be informed of the meeting where the bid would be awarded. 2025 Chip Seal Project Engineer Olinger stated that four quotes were received for the chip seal project. $90,000 was budgeted for the project. The low bid was approximately $60,000. Olinger would like to expand the contract by $20,000 to cover what was planned for 2026. This would still come in $10,000 under budget.

Basis for recommending expansion of the chip seal contract into 2026 work.

At the meetingCouncil approved the expansion up to $20,000.

Answered from our records

The engineer's numbers hold. Four quotes were received, the low quote from Pearson Bros was $59,951.55, and adding $20,000 brings the ceiling to $79,951.55, which is $10,048.45 under the $90,000 budgeted. The spread across the four quotes was $36,734.15, with Fahrner at $96,685.70 bidding 61 percent above Pearson.

KENYON_BIDS.md, 2025-05-13 entry; 5-13-25 council packet updated

To look upAdministrator Scott Lehnerfrom the minutes
Administrator Calendar Administrator Lehner stated that he will be out of the office on Friday, April 11, 2025. He is closing on a house in the area.

Administrator calendar update.

Answered from our records

The calendar note is confirmed verbatim in the May 13 2025 packet: Administrator Lehner was out of the office Friday April 11 2025, closing on a house in the area. It required no council action and nothing turns on it.

5-13-25 council packet updated, Administrator Calendar

RequestBailey Ament, citizenfrom the minutes
She is interested in raising chickens as part of her homeschool instruction and her children's 4-H project. She requested to be added to the May council agenda to allow educational chickens.

She wants to raise chickens as part of her homeschool instruction and her children's 4-H project and reviewed what surrounding cities allow.

What happened next

The item reached the council on June 10 2025 as Consider Revising Chicken Ordinance, and the council voted against looking at a change. The roll call was Bailey aye, Kirchmann aye, Brunner nay, Sjolander nay, Helgeson nay. Administrator Lehner noted it was the fourth time the request to allow chickens in the city had come before the council since 2015.

6-10-25 COUNCIL PACKET Updated, New Business · taken up again 2025-06-10

QuestionBailey Ament, citizenfrom the minutes
Bailey Ament questioned what the process was for allowing chickens in the residential area for educational purposes.

Citizen comment asking how Kenyon could permit chickens, with options from surrounding cities presented.

At the meetingNo process answer recorded; she was to be added to the May agenda.

What happened next

The process was an ordinance amendment, and the council declined to start it. Attorney Riggs reviewed the history of the current ordinance at the June 10 2025 meeting and the council took a roll call vote on whether to look at changing it, losing 2 to 3. An earlier request by letter had drawn a council consensus to uphold the ordinance restricting chickens in residential areas.

6-10-25 COUNCIL PACKET Updated; 5-13-25 council packet updated · taken up again 2025-06-10

RequestDoug Ims, Icon LLCfrom the minutes
He would like to be informed of the meeting where the bid would be awarded. 2025 Chip Seal Project Engineer Olinger stated that four quotes were received for the chip seal project. $90,000 was budgeted for the project.

Icon was low bidder but was told by the city engineer its bid would not be recommended.

At the meetingEngineer had stated the bid would be awarded following the assessment hearing at the May council meeting.

What happened next

There was no award meeting from that round. On June 10 2025 Attorney Riggs recommended rejecting all bids and the council voted 5-0-0 to reject them and rebid, tabling Resolution 2025-14. The project was rebid and awarded on July 8 2025 to Fitzgerald Excavating at $2,294,629.25. Whether Icon received written notice of any award meeting is not in our record.

6-10-25 COUNCIL PACKET Updated; KENYON_BIDS.md, 2025-07-08 entry · taken up again 2025-06-10

PendingEngineer Derek Olingerfrom the minutes
The bids are still being evaluated for conformance with project requirements. The bid will be awarded following the assessment hearing during the May council meeting.

Six bids were received April 2 and are still being evaluated for conformance with project requirements.

At the meetingCouncil adopted Resolution 2025-12 calling the assessment hearing.

What happened next

The council rejected every bid from the first round on June 10 2025, 5-0-0, on Attorney Riggs' recommendation, and Resolution 2025-14 was tabled. The rebid opened July 8 2025 with Fitzgerald Excavating low at $2,294,629.25 against BCM at $2,423,525.98, Alcon at $2,426,712.04, Heselton at $2,653,939.05 and an engineer's estimate of $2,764,170.05, and Fitzgerald took the contract. The winning rebid price came in $12,023.16 below the lowest first-round bid.

6-10-25 COUNCIL PACKET Updated; KENYON_BIDS.md; data/bids.csv · taken up again 2025-07-08

To look upEngineer Derek Olingerfrom the minutes
ENGINEERING 2025 Street and Utility Improvements Engineer Olinger stated that six bids were received by the April 2, 2025 deadline. The pricing was competitive. The bids are still being evaluated for conformance with project requirements.

Bids were received by the April 2, 2025 deadline and pricing was competitive.

What happened next

The review concluded that Icon's bid materially deviated from the specifications. The City Engineer's letter of May 12 2025 found Icon failed to provide bid unit prices as the request for bids required, citing bid items 1, 13, 17, 1009, 1011, 79 and 105, and staff recommended rejecting it. The council then rejected all six bids on June 10 2025 and rebid the project.

5-13-25 council packet updated, City Engineer letter dated May 12 2025; 6-10-25 COUNCIL PACKET Updated · taken up again 2025-06-10

Action itemAdministrator Scott Lehnerfrom the minutes
PRESENTATIONS/PUBLIC HEARINGS/RECOGNITIONS/PROLAMATIONS ADMINISTRATOR UPDATE KMU Process Update: Administrator Lehner stated that there is a meeting scheduled with KMU and the personnel committee on Wednesday, April 9, 2025 at 4:00 p.m. 15 Hiring of Police Officer: Administrator Lehner stated that four qualified candidates applied for the police officer position. The four candidates are scheduled to be interviewed on April 15.

Four candidates applied for the open police officer position after Josey Homeier's departure.

What happened next

The interviews produced a hire. By June 10 2025 Administrator Lehner reported the city was moving forward with one of the police officer applicants, a background check was underway, and the officer should be on board by mid to late June 2025. The department did not stay staffed: by September 8 2026 the officer position was posted again with no applicants and part-time officers filling in.

6-10-25 COUNCIL PACKET Updated; 9-8-26 Council Packet · taken up again 2025-06-10

Action itemEngineer Derek Olingerfrom the minutes
Capital Finance Planning Workshop Engineer Olinger stated that the city's financial advisor is invited to review the plans for current and future capital investments every few years. A capital finance planning workshop meeting was scheduled for Tuesday, April 29, 2025 at 6:00 p.m.

The financial advisor is invited every few years to review plans for current and future capital investments.

At the meetingMotion carried 4-0-0 to schedule the workshop.

What happened next

The workshop was held and George Eilertson presented. He updated the financial management plan he had last prepared for the city in 2021, rebuilt on Bolton and Menk's 2025 Infrastructure Management Plan, covering estimated property taxes for debt service, the impact on utility revenues, and the financing plan for the 2025 street project. Engineer Olinger summarized the infrastructure management plans and the city's infrastructure goals.

5-13-25 council packet updated · taken up again 2025-05-13

PendingTodd Greseth, Goodhue County Commissionerfrom the minutes
Todd Greseth, Goodhue County Commissioner, stated that the May meeting will be held at Kenyon City Hall. He stated that their budget is up in the air right now, waiting to see where government cuts will be.

Commissioner update during citizen comments about county finances.

What happened next

The county settled on a 6.5 percent levy increase for 2026, which Commissioner Greseth reported to the council in the February 10 and March 10 2026 packets. He added that an even larger increase is coming in 2027 because of state mandates. For comparison, the city's own certified 2026 levy rose 9.18 percent to $1,528,541 and its 2027 preliminary levy rose 9.26 percent to $1,670,115.

2-10-26 and 3-10-26 Council Packets; taxes/data/kenyon_tax.json · taken up again 2026-02-10

Action itemAdministrator Scott Lehnerfrom the minutes
PRESENTATIONS/PUBLIC HEARINGS/RECOGNITIONS/PROLAMATIONS ADMINISTRATOR UPDATE KMU Process Update: Administrator Lehner stated that there is a meeting scheduled with KMU and the personnel committee on Wednesday, April 9, 2025 at 4:00 p.m. 15 Hiring of Police Officer: Administrator Lehner stated that four qualified candidates applied for the police officer position.

Part of the ongoing KMU process update.

What happened next

The meeting track produced five signed contracts. The KMU Commission accepted and signed five agreements with the city on April 23 2025, two weeks after the April 9 personnel committee meeting, and the council gave final approval on June 10 2025 to the administrative staff supervision agreement, the building and property control agreement, the personnel utilization agreement, the billing agreement, the municipal project agreement and the organizational chart. Minutes of the April 9 meeting itself are not in our record.

6-10-25 COUNCIL PACKET Updated; 5-13-25 council packet updated · taken up again 2025-06-10

PendingEngineer Derek Olingerfrom the minutes
The bid will be awarded following the assessment hearing during the May council meeting. The assessment hearing process and the assessment criteria that the council will need to set were discussed.

The assessment hearing process and criteria were reviewed ahead of the May hearing.

At the meetingResolution 2025-12 declaring cost to be assessed and calling the hearing was adopted 4-0-0.

What happened next

The council adopted Resolution 2025-12 declaring the cost to be assessed and calling the hearing, 4-0-0, held the assessment hearing on May 13 2025, and then continued it to July 8 2025 with an updated assessment summary after the project was rebid. No council-adopted assessment policy appears in our record, only the project-specific roll.

5-13-25 council packet updated; 7.8.25 Updated Council Packet and Agenda · taken up again 2025-07-08

Unsourced claimDoug Ims, Icon LLCfrom the minutes
Doug Ims of Icon, LLC stated that his company was the low bidder on the street project, but he was told by the city engineer that his bid would not be recommended because of the way he bid the job.

Icon disputed the engineer's role in recommending against its bid.

At the meetingNo response from the engineer is recorded in the minutes.

Partly answered

Icon was not low on base plus all alternates. The bid tabulation puts Icon at $2,313,649.71 and BCM Construction at $2,306,652.41, a difference of $6,997.30 in BCM's favor, and our bid record marks Icon's bid nonresponsive. The engineer's stated reason was specific and documented: Icon did not provide the bid unit prices the request for bids required, affecting bid items 1, 13, 17, 1009, 1011, 79 and 105. Whether Icon was low on some narrower basis cannot be determined from the tabulation we hold.

Doug Ims told the council Icon was the low bidder, but the tabulation shows BCM Construction at $6,997.30 less on base plus all alternates.

5-13-25 council packet updated, bid tabulation and engineer letter; KENYON_BIDS.md

RequestBonnie Rapp and Brenda Tellez, on behalf of Taco Expressfrom the minutes
He stated that they were requesting that the city allow them to remain on city property for one more year because of the short notice.

They were shocked to learn the contract was not renewed and need time to find an alternative location for 2026.

At the meetingCouncil authorized the administrator to negotiate a limited 2025 agreement.

Partly answered

The council met the request in principle, authorizing Administrator Lehner 4-0-0 to negotiate and execute a limited 2025 agreement so Taco Express could stay on city property for the year. The decision not to renew had been made at the March 2025 meeting and the owners learned of it from a newspaper article, for which Lehner apologized. The executed agreement and its terms are not in our record.

5-13-25 council packet updated, Old Business · taken up again 2025-05-13

RequestTodd Greseth, Goodhue County Commissionerfrom the minutes
He stated that their budget is up in the air right now, waiting to see where government cuts will be. If you have any questions for the commission, please come to the May meeting in Kenyon.

The county board's May meeting will be held at Kenyon City Hall.

Partly answered

The practice recurred: Commissioner Greseth again told the council in early 2026 that the May county commissioner meeting would be held at Kenyon City Hall, though by then he asked residents to contact him directly rather than attend. We hold no county board agenda or confirmed meeting date for either year. The Goodhue County Board calendar would settle it.

2-10-26 and 3-10-26 Council Packets · taken up again 2026-02-10

Unsourced claimminutes (speaker not named)from the minutes
State statutes limit a city's tort liability to a maximum of $500,000 per claimant and $1,500,000 per occurrence.

Explanation given before the council voted not to waive LMCIT liability limits.

At the meetingCouncil voted 4-0-0 to follow past precedence and not waive the limits.

Partly answered

The same figures appear verbatim in the city's own packets across two years: $500,000 per claimant, $1,500,000 per occurrence, and optional additional coverage up to $2,000,000 annually. The council took the question up again on May 12 2026 and voted 5-0-0, again on Helgeson's motion seconded by Kirchmann, to follow past precedence and not waive the limits. We hold no copy of the statute or the League of Minnesota Cities Insurance Trust waiver form itself.

5-13-25 council packet updated; 4-12-26 Council packet; 5-12-26 Council Packet Updated · taken up again 2026-05-12

Unsourced claimPat Shea, citizenfrom the minutes
CITIZEN COMMENT Pat Shea provided information on a proposed wind farm that is trying to move into the Kenyon area. She stated that this is a huge 300-megawatt farm project that would have 60-85 turbines.

Citizen comment raising awareness of a wind project that could affect the city.

At the meetingNo council response recorded.

We hold no data

We hold no wind project application, state permitting filing or turbine count for any development near Kenyon. The city's only wind commitment in our record is unrelated: a half-megawatt power sales agreement with CMPAS at Bingham Lakes, adopted as Resolution 2025-31 in December 2025. A Public Utilities Commission site permit application would settle the 300-megawatt claim.

would settle it: The developer's project application or state permitting filing

Action itemCouncil Member Helgeson (motion), seconded by Baileyfrom the minutes
Motion by Helgeson seconded by Bailey to authorize Administrator Lehner to negotiate and execute a limited agreement with Taco Express for 2025.

Taco Express representatives asked to stay on city property one more year after learning of non-renewal from a newspaper article.

At the meetingMotion carried 4-0-0.

We hold no data

We hold no signed 2025 agreement with Taco Express. The executed limited agreement or a council report on its terms would settle it.

would settle it: The signed limited 2025 agreement with Taco Express

Action itemFinance Director Kyllofrom the minutes
LEGAL FINANCIAL Explanation of Recently Received IRS Statements Finance Director Kyllo explained two letters that she received, one from the IRS and the other from MN Department of Revenue claiming money was owed to them from quarter three of 2023. Both claims are legitimate, and the city needs to pay these bills plus penalties.

Two letters claimed money owed from Q3 2023 and both claims were determined to be legitimate.

At the meetingKyllo explained the letters to council.

We hold no data

The IRS and Minnesota Department of Revenue notices are not in our archive, so the amounts owed and the penalties cannot be stated. The nearest figure we hold is Abdo's one-time $15,000 charge to reconcile January through July 2025 records.

9-8-26 Council Packet · would settle it: The IRS and Department of Revenue notices showing amounts owed and penalties

To look upFinance Director Kyllofrom the minutes
LEGAL FINANCIAL Explanation of Recently Received IRS Statements Finance Director Kyllo explained two letters that she received, one from the IRS and the other from MN Department of Revenue claiming money was owed to them from quarter three of 2023.

She explained two letters claiming money owed but the minutes record no dollar figures.

We hold no data

No dollar figures for the IRS or Minnesota Department of Revenue claims appear anywhere in our record, and the later passages attached to this item concern accounts payable procedure and street assessments. The two agency notices would settle it.

would settle it: Dollar amounts from the IRS and state notices

Decisions 7 motions

Who did what

PersonAt this meeting
Donald Kirchmann
Mayor
Called the meeting to order; seconded Resolution 2025-12 and the LMCIT waiver motion; thanked Officer Josey Homeier
Kim Helgeson
Council Member
Moved to adopt the agenda, award the chip seal contract, authorize the Taco Express agreement, not waive LMCIT limits, and adjourn; reminded everyone of the April 19 Easter egg hunt at Depot Park
Mary Bailey
Council Member
Arrived at 7:17 p.m.; moved the consent agenda and Resolution 2025-12; thanked city staff
Elana Brunner
Council Member
Seconded the motion to adopt the agenda
Lee Sjolander
Council Member
Absent
Scott Lehner
City Administrator
Reported on the KMU process meeting, police officer hiring, Josey Homeier's departure and his calendar; presented the Taco Express request and apologized for the notification lapse
Derek Olinger
City Engineer, Bolton & Menk
Reported six competitive bids on the street project, explained the assessment hearing process, and recommended expanding the chip seal contract
Holli Gudknecht
Administrative Assistant / Deputy City Clerk
Recorded and signed the minutes; prepared agenda item reports
Joe Sathe
City Attorney
Present at the meeting
Wayne Ehrich
Public Works Supervisor
Present at the meeting
Pat Shea
Citizen
Provided information on a proposed 300-megawatt wind farm with 60-85 turbines near Kenyon
Bailey Ament
Citizen
Asked about the process for allowing chickens in residential areas for homeschool and 4-H purposes and requested a spot on the May agenda
Todd Greseth
Goodhue County Commissioner
Announced the county's May meeting would be at Kenyon City Hall and that the county budget is uncertain
Doug Ims
Icon LLC
Stated his company was the low bidder and objected to the city engineer's recommendation against his bid
Bonnie Rapp
Citizen
Spoke in support of Taco Express remaining on city property
Brenda Tellez
Daughter of Taco Express owners
Said the family was shocked to learn of the non-renewal from a newspaper article
Josey Homeier
Police Officer
Recognized for her service; leaving for a DNR job
Brian Homeier
Police Officer
Present at the meeting
Kyllo
Finance Director
Explained IRS and MN Department of Revenue letters claiming money owed from quarter three of 2023

Organizations named: City of Kenyon, Kenyon Municipal Utilities (KMU), Goodhue County, Bolton & Menk, Inc., Icon, LLC, Pearson Bros. Inc, BCM Construction Inc., Wencl Construction Inc., Heselton Construction LLC, Snow Contracting LLC, A-1 Excavating LLC, Asphalt Surface Technologies Corp., Fahrner Asphalt Sealers LLC, Allied Blacktop Company, League of Minnesota Cities Insurance Trust (LMCIT), Kenyon VFW, Kenyon Fire Relief Association, Kenyon Area Historical Society, Rose Fest, Taco Express, Internal Revenue Service, Minnesota Department of Revenue, Minnesota DNR, Kennedy & Graven Chartered, Kenyon Leader, Kenyon EDA

Figures

AmountWhat
$2,500Budget transfer to Kenyon Area Historical Society for Gunderson House management fees
$2,000Budget transfer to Rose Fest
$10,000Kenyon Fire Relief budget donation
$3,000Kenyon Fire Relief 2025 audit portion
$250Fire and Rescue administrative fee
$90,000Amount budgeted for the 2025 chip seal project
$60,000Approximate low bid for the chip seal project (Pearson Bros. quote $59,951.55)
$20,000Additional amount the City Engineer may authorize on the chip seal contract to cover work planned for 2026
$500,000Statutory tort liability limit per claimant
$1,500,000Statutory tort liability limit per occurrence
$2,000,000Maximum additional annual insurance coverage cities may purchase

Said at the meeting

She stated that this is a huge 300-megawatt farm project that would have 60-85 turbines.

Pat Shea, citizen · minutes, verbatim

He stated that their budget is up in the air right now, waiting to see where government cuts will be.

Todd Greseth, Goodhue County Commissioner · minutes, verbatim

He felt that the city engineer was out of place to make this recommendation.

Doug Ims, Icon LLC · minutes, verbatim

Administrator Lehner apologized for not informing them of the decision before it came out in the newspaper.

Scott Lehner, City Administrator · minutes, verbatim

Both claims are legitimate, and the city needs to pay these bills plus penalties.

Minutes (Finance Director Kyllo report) · minutes, verbatim

Resolutions and ordinances

  • Declaring Cost to be Assessed and Calling for Assessment Hearing 2025 Street & Utility Improvements Motion by Bailey seconded by Kirchmann toRes. 2025-12

Agenda

Each item links to where it appears in the packet.

  1. I. CALL TO ORDER AND ROLL CALL
  2. II. CITIZEN COMMENTS
  3. III. ADOPT AGENDA
  4. III.A Council Agenda 4/8/2025
  5. IV. CONSENT AGENDA
  6. IV.A Items to be approved with one motion on the Consent Agenda
  7. V. APPROVAL OF MINUTES and APPOINTMENTS
  8. V.A City Council Meeting Minutes of March 11, 2025
  9. VI. PRESENTATIONS/PUBLIC HEARINGS
  10. VII. ADMINISTRATOR UPDATE
  11. VII.A ADMINISTRATOR UPDATE
  12. VIII. ENGINEERING
  13. VIII.C Capital Finance Planning - Council Workshop
  14. IX. LEGAL
  15. X. FINANCIAL
  16. X.A FINANCIAL
  17. D. Explanation of Recently Received IRS Statements
  18. XI. OLD BUSINESS
  19. XII. NEW BUSINESS
  20. XII.A LMCIT Liability Coverage Waiver
  21. XIII. F.Y.I. - Department Updates
  22. XIII.A FYI 4-8-25
  23. XIV. COUNCIL AND STAFF GENERAL COMMENTS
  24. XV. ADJOURNMENT
  25. A. On-Sale Liquor License Renewal- VFW
  26. B. Kenyon Fire Relief Association Request for Liquor Permits
  27. A. City Council Meeting Minutes of March 11, 2025
  28. VI. PRESENTATIONS/PUBLIC HEARINGS RECOGNITIONS/PROCLAMATIONS
  29. A. KMU Process Update
  30. B. Hiring of Police Officer
  31. C. Congrats and Thank You to Josey Homeier
  32. D. Administrator Calendar
  33. C. Capital Finance Planning Workshop
  34. A. LMCIT Liability Coverage Waiver
  35. XIII. OTHER BUSINESS
  36. A. Schedule of Upcoming Meetings

Full packet text (156k characters)

The minutes

Official minutes as adopted, from 5-13-25 council packet updated; text extracted from the PDF.

Council Meeting was duly held in the City Council chambers at 7:00 p.m. on the 8th day of April 2025. The meeting was called to order by Mayor Donald Kirchmann.

Present
Mayor Donald Kirchmann, Council Members Kim Helgeson, Mary Bailey (arrived at 7:17 p.m.), and Elana Brunner
Absent
Lee Sjolander
Also present
City Administrator Scott Lehner, Administrative Assistant Holli Gudknecht, Engineer Derek Olinger, City Attorney Joe Sathe, Public Works Supervisor Wayne Ehrich, Officer Brian Homeier, Lizzie Cooper-Kenyon Leader, Doug Ims-Icon LLC, John Lee, Josh Johnson, Todd Greseth, Bailey Ament, Bonnie Rapp, Brenda Tellez, Caleb Langer, Lorry and Jennifer Kispert, Shannon & Pat Shea,

The meeting opened with the Pledge of Allegiance.

Citizen Comment

Pat Shea provided information on a proposed wind farm that is trying to move into the Kenyon area. She stated that this is a huge 300-megawatt farm project that would have 60-85 turbines. She wanted to get awareness out there since this would probably affect the city in some way.

Bailey Ament questioned what the process was for allowing chickens in the residential area for educational purposes. She presented possible options of allowing chickens in Kenyon and reviewed what some surrounding cities allow. She is interested in raising chickens as part of her homeschool instruction and her children's 4-H project. She requested to be added to the May council agenda to allow educational chickens.

Todd Greseth, Goodhue County Commissioner, stated that the May meeting will be held at Kenyon City

Hall. He stated that their budget is up in the air right now, waiting to see where government cuts will be. If you have any questions for the commission, please come to the May meeting in Kenyon.

Adopt Agenda

Motion

Motion by Helgeson seconded by Brunner to approve the agenda. Motion carried 4-0-0.

Consent Agenda

Motion

Motion by Bailey second by Helgeson to approve the amended Consent Agenda, which includes:

Motion carried 4-0-0

Presentations / Public Hearings / Recognitions / Prolamations

Administrator Update

KMU Process Update: Administrator Lehner stated that there is a meeting scheduled with KMU and the personnel committee on Wednesday, April 9, 2025 at 4:00 p.m.

Hiring of Police Officer: Administrator Lehner stated that four qualified candidates applied for the police officer position. The four candidates are scheduled to be interviewed on April 15.

Congrats and Thank You to Josey Homeier: Administrator Lehner thanked Officer Josey Homeier for her contributions and service time with the City of Kenyon. She will be moving on to a DNR job. Best Wishes.

Administrator Calendar Administrator Lehner stated that he will be out of the office on Friday, April 11, 2025. He is closing on a house in the area.

Engineering

2025 Street and Utility Improvements Engineer Olinger stated that six bids were received by the April 2, 2025 deadline. The pricing was competitive. The bids are still being evaluated for conformance with project requirements. The bid will be awarded following the assessment hearing during the May council meeting. The assessment hearing process and the assessment criteria that the council will need to set were discussed. Resolution 2025-12: Declaring Cost to be Assessed and Calling for Assessment Hearing 2025 Street & Utility Improvements

Motion

Motion by Bailey seconded by Kirchmann to adopt Resolution 2025-12. Motion carried 4-0-0.

Doug Ims of Icon, LLC stated that his company was the low bidder on the street project, but he was told by the city engineer that his bid would not be recommended because of the way he bid the job. He felt that the city engineer was out of place to make this recommendation. He would like to be informed of the meeting where the bid would be awarded.

2025 Chip Seal Project Engineer Olinger stated that four quotes were received for the chip seal project. $90,000 was budgeted for the project. The low bid was approximately $60,000. Olinger would like to expand the contract by $20,000 to cover what was planned for 2026. This would still come in $10,000 under budget.

Motion

Motion by Helgeson seconded by Bailey to award the chip seal contract to Pearson Bros. as written, with additional approval to exceed the total quoted by up to $20,000 as directed by the City Engineer. Motion carried 4-0-0.

Capital Finance Planning Workshop

Engineer Olinger stated that the city's financial advisor is invited to review the plans for current and future capital investments every few years. A capital finance planning workshop meeting was scheduled for Tuesday, April 29, 2025 at 6:00 p.m. Motion carried 4-0-0.

Legal

Financial

Explanation of Recently Received IRS Statements

Finance Director Kyllo explained two letters that she received, one from the IRS and the other from MN Department of Revenue claiming money was owed to them from quarter three of 2023. Both claims are legitimate, and the city needs to pay these bills plus penalties.

Old Business

16 2025 Agreement with Luis Tellez – Taco Express Administrator Lehner stated that at the March council meeting, the council decided not to renew the city's agreement with Taco Express for 2025. Bonnie Rapp and Brenda Tellez, who is the daughter of the Taco Express owners, were present and stated that they were shocked to learn that the contract was not being renewed. They learned about the non-renewal from a newspaper article. Administrator Lehner apologized for not informing them of the decision before it came out in the newspaper. He stated that they were requesting that the city allow them to remain on city property for one more year because of the short notice. This would allow them to find an alternative place for business in 2026.

Motion

Motion by Helgeson seconded by Bailey to authorize Administrator Lehner to negotiate and execute a limited agreement with Taco Express for 2025. Motion carried 4-0-0.

New Business

LMCIT Liability Coverage Waiver

stated that the City Council is required to choose either to waive or not to waive the monetary insurance liability limits. State statutes limit a city's tort liability to a maximum of $500,000 per claimant and $1,500,000 per occurrence. These limits apply whether the claim is against the city, against the individual officer or employee, or against both. Cities can choose to waive the state liability limits. Cities can purchase additional insurance coverage up to $2,000,000 annually.

Motion

Motion by Helgeson, seconded by Kirchmann to follow past City precedence to not waive LMCIT State Liability limits. Motion carried 4-0-0.

Schedule for Upcoming Meetings

KMU/Personnel Committee Meeting: Wednesday, April 9th @4:00 p.m. KMU Meeting: Tuesday, April 15th @ 4:00 p.m. EDA Meeting: Tuesday, April 22nd @ 8 a.m. City Council Workshop Meeting: Tuesday, April 29 @ 6:00 p.m. City Council Meeting: Tuesday, May 13th @ 7 p.m.

Council And Staff General Comments

Mayor Kirchmann thanked Officer Josey Homeier and wished her well.

Council Member Helgeson congratulated Officer Josey Homeier. She thanked her for her service to the city and wished her the best. She also reminded everyone of the Easter egg hunt on April 19 at the Depot Park.

Council Member Bailey thanked the city staff for their work.

Motion

Motion by Helgeson seconded by Bailey to adjourn the meeting at 8:12 p.m. Motion carried 4-0-0.

Holli Gudknecht, Deputy City Clerk Donald Kirchmann, Mayor

AGENDA ITEM NO. VI.A

Agenda Item Summary

CITY COUNCIL AGENDA ITEM REPORT

DATE: May 13, 2025
SUBMITTED BY: Holli Gudknecht, Engineering
ITEM TYPE: Engineering

Agenda Section: Presentations / Public Hearings

RECOGNITIONS/PROCLAMATIONS

SUBJECT: Assessment Hearing - 2025 Street & Utility Improvements
SUGGESTED ACTION: See Attachments

Attachments:

01.1_RCA_Assessment Hearing-2025 Street & Utility Improvements.pdf 01.2_Assessment Hearing Presentation Slides.pdf

REQUEST FOR COUNCIL ACTION Agenda Item: Department: Requested Council Meeting Date: Submitted By: Engineering 5/13/2025 Derek Olinger

TITLE OF ISSUE: Assessment Hearing - 2025 Street & Utility Improvements

BACKGROUND AND SUPPLEMENTAL INFORMATION:

In accordance with Ch. 429 of Mn Statutes, the final step needed to approve special assessments for the 2025 Street & Utility project is a public hearing.

During this part of the meeting, the city engineer will begin with a brief presentation to summarize project scope, costs, and the proposed assessments. Following the presentation, we'll open the floor for public comments.

Please note, a neighborhood informational meeting was held on May 7 th at 5:30 pm at City Hall. Only two property owners attended (owners of 612 8th St and 626 8th St). Both were opposed to the 8th Street sidewalk alternate work.

Following comments, the hearing should be closed. Decisions related to assessments will be requested later in the agenda.

SOURCE OF FUNDING: Future Project Financing

REQUESTED COUNCIL ACTION: Motion to open/close the public hearing

Supporting Documents Attached:

Resolution Ordinance Contract Minutes OTHER

Presentation

19 2025 Street & Utility Improvements Public Assessment Hearing

5/13/2025

Improvement Summary • Multi-year plan

• Reduce I&I into sanitary

• Replace small Diam, Cast Iron Watermain

• Maintain & Improve Streets

Project Cost Summary PROJECT COMPONENT TOTAL PROJECT COST • Total Costs STREET & SITE 8TH STREET (36' URBAN RECONST) $386,305.71 • Construction Bids LANGFORD AVENUE (25'-30' URBAN RECONST) ALTERNATE 5TH STREET (25' URBAN RECONST) $500,007.34 $270,833.30 • Design ALTERNATE FOREST STREET (MILL & OVERLAY) $71,507.11 • Financing SIDEWALK ALTERNATE 5TH STREET (5-6' WIDE) ALTERNATE 8TH STREET & RED WING AVE $59,874.40 $84,787.10 • Costs reflect all Alternates (TBD) SANITARY SEWER 8TH STREET (SANITARY MAIN) $60,010.29 1. 5th Street Reconst 8TH STREET (SANITARY SERVICES) SANITARY SEWER LINING (FOREST, SPRING, PINE, PEARL $33,183.28 $429,441.14 2. Forest St Overlay WATER SYSTEM 8TH STREET (WATERMAIN) $155,930.44 3. Red Wing Sidewalk LANGFORD AVENUE (WATERMAIN) ALTERNATE 5TH STREET (WATERMAIN) $210,461.20 $84,446.14 4. 8th Street Sidewalk 2ND STREET (WATERMAIN) 8TH ST, LANGFORD AVE, 2ND ST (WATER SERVICES) $496,751.25 $81,726.37 • Costs Bonded  Repaid via STORM SEWER LANGFORD AVE (STORM SEWER) $150,565.88 Utility Revenue, Property Tax & ALTERNATE 5TH STREET (STORM SEWER) $28,221.44 Special Assessments TOTALS $3,104,052.39

Special Assessments Street Costs (per foot of frontage) • Street & Sidewalk Reconstruction 50%/50% 32% Assessed, 68% City • Pavement Overlays 0% Assessed, 100% City* • Oversizing not assessable • Heavy-Duty Pavements, Widths greater than 28' • Frontage Adjustments: Corner lots, min/max lot sizes, odd or rectangular lots, many others Sanitary Sewer and Water Costs (per connection) • Main Reconstruction, Rehab 0% Assessed, 100% City • Private Service 100% Assessed, 0% City Storm Sewer • 0% Assessed, 100% City

Special Assessments Assessment Rates Project Component Final Assessment Unit Street & Site (8th Street) $117.21 per Ft Street & Site (Langford) $98.15 per Ft Street & Site (5th Street*) $88.89 Per Ft Detailed assessment roll Sidewalk (5th Street*) $20.68 per Ft available for viewing Sidewalk (8th Street* & Red Wing*) $16.76 per Ft Sanitary Services $2,765.27 per Connect Water Services $3,405.27 per Connect Any Alternate Assessment subject to change. Revised Typical Total Assessment Assessments will receive final notice (8th St, w/ Sanitary & Water) 100' Residential Lot 50' Residential Lot Total (w/o walk) $17,891 $12,031 Total (w/ walk) $19,567 $12,869

Assessment Payment • Prepayment • Full or Partial Payment by 11/15/25 • Balance Certified to 2026 Taxes • 15 Years, 5.25% interest (subject to final approval) • If paying off in full at later date, do so prior to November 15th of given year to avoid being changed interest for following year • Deferment options (contact City Hall) • Agricultural Land, Unimproved Land, • 65 or older or retired by Permanent/Total Disability (Homestead Property Only) • Deferment of principle amount, interest will continue to accrue • If desired contact City Staff

Owner's Right to Objection/Appeal Public can comment on project/assessment at this hearing

Property owner has the right to formally object to the assessment. • Must be made in writing. • Must be submitted by close of this Public Hearing (on 13th).

Property owner has the right to appeal the assessment. • Appeal must be filed in District Court within 30 days of this hearing. • Written Objection must be submitted at this Public Hearing in order to file an appeal.

Conclusion & Upcoming Decision • Public Hearing • Approach Podium, state name & address • State your comments • Comments documented & taken into consideration

• Following Hearing (this meeting) • Consider awarding project & select alternates • Consider approving assessments

Thank You Derek Olinger, P.E. Questions? Kenyon City Engineer Derek.Olinger@bolton-menk.com 507-525-2685

Agenda Item Summary CITY COUNCIL AGENDA ITEM REPORT

DATE: May 13, 2025
SUBMITTED BY: Holli Gudknecht, Administration
ITEM TYPE: Miscellaneous
AGENDA SECTION: Administrator Update

Subject:

ADMINISTRATOR UPDATE

1. Hiring of Police Officer 2. Business Park Update 3. Community Access Channel

SUGGESTED ACTION: Administrator Lehner will present his update.

Attachments:

AGENDA ITEM NO. VII.A

Agenda Item Summary

CITY COUNCIL AGENDA ITEM REPORT

DATE: May 13, 2025
SUBMITTED BY: Holli Gudknecht, Engineering
ITEM TYPE: Engineering

Agenda Section: Engineering

SUBJECT: Bid Acceptance - 2025 Street & Utility Improvements
SUGGESTED ACTION: See Attachments

Attachments:

02.1_RCA_Bid Acceptance-2025 Street & Utility Improvements.pdf 02.2_Bid Recommendation Letter_05-12-2025.pdf 02.3_Resolution 2025-14_Accepting Bid.pdf

REQUEST FOR COUNCIL ACTION Agenda Item: Department: Requested Council Meeting Date: Submitted By: Engineering 5/13/2025 Derek Olinger

TITLE OF ISSUE: Bid Acceptance - 2025 Street & Utility Improvements

BACKGROUND AND SUPPLEMENTAL INFORMATION:

Bids have been received for the 2025 Street & Utility Improvements. Prior to moving forward with decisions related to assessments and other project-related items, the project should be awarded, and the council should identify the desired work alternates.

Please see the attached bid recommendation letter, as there are other considerations regarding bid selection.

SOURCE OF FUNDING: Future Project Financing

REQUESTED COUNCIL ACTION: Requesting Approval of Resolution 2025-14 (state desired alternates) Alternate 1: 5th Street Reconstruction Alternate 2: Forest Street Mill & Overlay Alternate 3: Red Wing Ave Sidewalk (7 th to 8th) Alternate 4: 8th Street Sidewalk

Supporting Documents Attached:

Resolution Ordinance Contract Minutes OTHER

X Letter

May 12, 2025

Scott Lehner, City Administrator

City of Kenyon

RE: 2025 Street & Utility Improvements

City of Kenyon Project No.: 24X.134934.000

Mr. Lehner:

This letter is intended to summarize our initial review and recommendations for bid award on the 2025 Street & Utility Improvement project.

Bids were received and opened at City Hall on Wednesday, April 2, 2025 at 11:00am for the 2025 Street & Utility Improvements. Six bids were received and the results are tabulated below:

Base Bid + Alternates Base Bid + Alternates

Bidder Base Bid 1, 2, 3 and 4 1, 2 and 3 ICON LLC $1,800,032.48 $2,313,649.71 $2,253,539.71 Wencl Construction Inc. $1,841,247.00 $2,412,395.00 $2,346,625.00 BCM Construction Inc. $1,841,550.67 $2,306,652.41 $2,257,825.98 Heselton Construction LLC $1,966,563.85 $2,450,833.81 $2,402,995.81 Snow Contracting LLC $2,054,391.83 $2,525,733.38 $2,479,196.68 A-1 Excavating LLC $2,225,450.38 $2,787,323.99 $2,734,103.99

Engineer's Estimate $2,316,763.50 $2,889,172.80 $2,854,292.80

A full abstract of bids is attached at the end of this letter. Staff investigated the bids and note the following unit price entries related to ICON's bid:

Item Description Quantity Unit Unit Price Extension

MOBILIZATION 1 LS $ 6,000.00 $ 6,000.00 13 EXCAVATION - MUCK 668 CY $ 0.01 $ 6.68 17 STABILIZING AGGREGATE (CV) 668 CY $ 0.01 $ 6.68 55 TURF MAINTENANCE 1 LS $ 0.01 $ 0.01 79 SANITARY SEWER TRACER SYSTEM 1 LS $ 0.01 $ 0.01 84 EXCAVATION - ROCK 100 CY $ 0.01 $ 1.00 105 WATERMAIN TRACER SYSTEM 1 LS $ 0.01 $ 0.01 1009 EXCAVATION – MUCK – 5th ST 235 CY $ 0.01 $ 2.35 1011 STABILIZING AGGREGATE (CV) – 5th ST 235 CY $ 0.01 $ 2.35 1049 WATERMAIN TRACER SYSTEM (5TH ST) 1 LS $ 0.01 $ 0.01

DOCSOPEN\KE200\215\1026923.v2-5/12/25 32 2025 Street & Utility Improvements 5/12/2025 Bid Recommendation Letter

Summary of Noted Items

 Item 1 mobilization includes preparation work and operations, including moving personnel, equipment, supplies and incidentals to the project to get the contractor established on site. This item also typically includes the costs of bonding, insurance, and demobilizing.  Items 13, 17, 1009, and 1011 are for work to stabilize unsuitable subgrade soils below the pavement, if/when encountered.  Item 79 and Item 105 are for utility location systems for the watermain and sanitary sewer which allow the city to find underground pipes.  Item 84 is intended to account for the additional time and effort to remove and dispose of hard bedrock from utility trenches.

Background

Bids for municipal contracts must substantially comply with all the requirements relative to the contract that are contained in statutes, charter provisions, ordinances, and advertisements. Determining whether the requirements are satisfied is an administrative act of discretion by the City Council.

On matters involving the substance of a competitive bid, such as those which may affect the price, quality or quantity, or the manner of performance, or other things that go into the actual determination of the amount of the bid, there may be no material variation or deviation from the specifications that provides a benefit or advantage not enjoyed by other bidders.

To reject a low bid, the City Council must have some reasonable ground for determining that the low bid materially deviates from the bid specifications.

Staff Recommendation

The City of Kenyon issued the request for bids seeking responses that use the unit price method for par cular line items and also requests certain items be lump sums. U lizing this method that includes both units prices and lump sums allows the City to more closely align the amount paid to the work performed. Instead of paying a contractor based on the total es mated amount of the work at the me of bidding, a city pays the contractor based on the bid unit price mul plied by the actual units of work performed for the unit price items and a lump sum for the lump sum items.

To that end, Ar cle 13, sec on 13.02 provides:

A. Bidder acknowledges that:

1. Each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor's overhead and profit for each separately iden fied item, and

2. Es mated quan es are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Work will be based on actual quan es, determined as provided in the Contract Documents.

DOCSOPEN\KE200\215\1026923.v2-5/12/25 33 2025 Street & Utility Improvements 5/12/2025 Bid Recommendation Letter

The City-chosen methodology provides the City with the ability to withhold payments specifically in response to the work being performed and even a par cular "unit" of work. Shi ing the costs away from the "unit" or the lump sum line item diminishes the City's ability to effec vely withhold payments for the work associated with that line item.

The City-chosen methodology allows for cost overruns and underruns to offset each other, while s ll maintaining the ability to effec vely withhold payments for incomplete work to ensure that essen al items such as stabilizing aggregate and muck excava on are completed in accordance with the specifica ons.

The City-chosen methodology provides the City with the opportunity to realize cost savings if the number of units performed is less than the es mate.

Depar ng from the City-chosen methodology for the listed items cons tutes a substan al and material variance from the request for bids because it forces the City to amend the structure and effec vely relinquish rights under the final contract that it clearly intended to be included in the contract. The new structure proposed by the ICON bid clearly affects how the final cost of the project is established. It would result in the City's payments being based more closely on a set sum and not the actual number of "units" of work performed, removes beneficial financial flexibility op ons based on actual work performed, and limits the effec veness of City enforcement mechanisms related to the contract costs.

Maintaining the ability to u lize the city-chosen contract structure and enforcement mechanisms is a key component to effec vely managing any project, but is especially important for a project with the scope of an annual street improvement project.

Instruc ons to Bidders, Ar cle 18, sec on 18.02 provides: Owner reserves the right to reject any or all Bids, including without limita on, nonconforming, nonresponsive, unbalanced, or condi onal Bids. Owner also reserves the right to waive all minor Bid informali es not involving price, me, or changes in the Work.

The staff recommenda on is to reject ICON's bid because it materially deviates from the bid specifica ons, including specifica ons for bid items 1, 13, 17, 1009, 1011 and 79 and 105.

Staff recommends the contract be awarded to the next lowest bid which is from BCM Construc on Inc. for the amount of $2,257,825.98.

Sincerely, Reviewed By: Bolton & Menk, Inc. Kennedy & Graven Chartered

Derek Olinger, PE Joseph L. Sathe

Kenyon City Engineer Assistant City Attorney

Cc: Scott Riggs, City Attorney

Enclosures

DOCSOPEN\KE200\215\1026923.v2-5/12/25 34 ABSTRACT OF BIDS 2025 STREET AND UTILITY IMPROVEMENTS CITY OF KENYON, MINNESOTA BMI PROJECT NO. 24X134934

Bid Date: 4 / 2 / 2025

TIME: 11:00 AM

Engineer's Estimate ICON, LLC Wencl Construction Inc BCM Construction Inc Heselton Construction LLC Snow Contracting LLC A-1 Excavating LLC ITEM MnDOT APPROX. Bolton & Menk, Inc. Dodge Center, MN Owatonna, MN Faribault, MN Faribault, MN Byron, MN Bloomer, WI NO. SPEC NO ITEM QUANT. UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Base Bid - Surface Improvements

1 2021.501 MOBILIZATION 1.00 LS $ 170,000.00 $ 170,000.00 $ 6,000.00 $ 6,000.00 $ 11,000.00 $ 11,000.00 $ 62,000.00 $ 62,000.00 $ 71,200.00 $ 71,200.00 $ 250,000.00 $ 250,000.00 $ 123,000.00 $ 123,000.00

2 2101.502 CLEARING 6.00 EACH $ 700.00 $ 4,200.00 $ 1,000.00 $ 6,000.00 $ 1,200.00 $ 7,200.00 $ 1,238.83 $ 7,432.98 $ 1,260.00 $ 7,560.00 $ 1,600.00 $ 9,600.00 $ 1,375.00 $ 8,250.00

3 2101.502 GRUBBING 6.00 EACH $ 700.00 $ 4,200.00 $ 1,000.00 $ 6,000.00 $ 400.00 $ 2,400.00 $ 412.94 $ 2,477.64 $ 420.00 $ 2,520.00 $ 400.00 $ 2,400.00 $ 917.00 $ 5,502.00

4 2104.502 SALVAGE SIGN 5.00 EACH $ 100.00 $ 500.00 $ 100.00 $ 500.00 $ 200.00 $ 1,000.00 $ 51.62 $ 258.10 $ 53.00 $ 265.00 $ 50.00 $ 250.00 $ 57.00 $ 285.00

5 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) 95.00 LF $ 6.00 $ 570.00 $ 2.00 $ 190.00 $ 5.00 $ 475.00 $ 3.92 $ 372.40 $ 5.00 $ 475.00 $ 3.00 $ 285.00 $ 6.00 $ 570.00

6 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 402.00 LF $ 6.00 $ 2,412.00 $ 1.00 $ 402.00 $ 5.00 $ 2,010.00 $ 3.92 $ 1,575.84 $ 3.00 $ 1,206.00 $ 3.00 $ 1,206.00 $ 3.00 $ 1,206.00

7 2104.503 REMOVE CURB AND GUTTER 1305.00 LF $ 4.00 $ 5,220.00 $ 5.00 $ 6,525.00 $ 5.00 $ 6,525.00 $ 4.57 $ 5,963.85 $ 3.70 $ 4,828.50 $ 5.00 $ 6,525.00 $ 5.00 $ 6,525.00

8 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT 103.00 SY $ 10.00 $ 1,030.00 $ 9.00 $ 927.00 $ 10.00 $ 1,030.00 $ 7.83 $ 806.49 $ 12.75 $ 1,313.25 $ 5.00 $ 515.00 $ 8.00 $ 824.00

9 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT 230.00 SY $ 9.00 $ 2,070.00 $ 6.00 $ 1,380.00 $ 5.00 $ 1,150.00 $ 7.83 $ 1,800.90 $ 10.20 $ 2,346.00 $ 5.00 $ 1,150.00 $ 6.00 $ 1,380.00

10 2104.504 REMOVE BITUMINOUS PAVEMENT 4907.00 SY $ 5.00 $ 24,535.00 $ 5.00 $ 24,535.00 $ 4.00 $ 19,628.00 $ 2.60 $ 12,758.20 $ 4.50 $ 22,081.50 $ 5.00 $ 24,535.00 $ 3.00 $ 14,721.00

11 2104.518 REMOVE CONCRETE WALK 400.00 SF $ 2.00 $ 800.00 $ 2.00 $ 800.00 $ 5.00 $ 2,000.00 $ 1.36 $ 544.00 $ 0.85 $ 340.00 $ 2.00 $ 800.00 $ 2.00 $ 800.00

12 2106.507 EXCAVATION - COMMON (P) 2857.00 CY $ 22.00 $ 62,854.00 $ 19.00 $ 54,283.00 $ 15.00 $ 42,855.00 $ 12.00 $ 34,284.00 $ 13.00 $ 37,141.00 $ 12.00 $ 34,284.00 $ 16.00 $ 45,712.00

13 2106.507 EXCAVATION - MUCK 668.00 CY $ 7.00 $ 4,676.00 $ 0.01 $ 6.68 $ 18.00 $ 12,024.00 $ 8.00 $ 5,344.00 $ 13.00 $ 8,684.00 $ 15.00 $ 10,020.00 $ 16.00 $ 10,688.00

14 2106.507 EXCAVATION - SUBGRADE (P) 1394.00 CY $ 22.00 $ 30,668.00 $ 19.00 $ 26,486.00 $ 15.00 $ 20,910.00 $ 12.00 $ 16,728.00 $ 13.00 $ 18,122.00 $ 12.00 $ 16,728.00 $ 16.00 $ 22,304.00

EXPLORATORY EXCAVATION 8.00 HR $ 600.00 $ 4,800.00 $ 750.00 $ 6,000.00 $ 500.00 $ 4,000.00 $ 275.00 $ 2,200.00 $ 230.00 $ 1,840.00 $ 500.00 $ 4,000.00 $ 400.00 $ 3,200.00

16 2106.507 SELECT GRANULAR EMBANKMENT (CV) (P) 1394.00 CY $ 25.00 $ 34,850.00 $ 30.00 $ 41,820.00 $ 30.00 $ 41,820.00 $ 26.77 $ 37,317.38 $ 28.25 $ 39,380.50 $ 25.00 $ 34,850.00 $ 41.00 $ 57,154.00

17 2106.507 STABILIZING AGGREGATE (CV) 668.00 CY $ 30.00 $ 20,040.00 $ 0.01 $ 6.68 $ 35.00 $ 23,380.00 $ 26.24 $ 17,528.32 $ 41.50 $ 27,722.00 $ 40.00 $ 26,720.00 $ 41.00 $ 27,388.00

18 2108.504 GEOTEXTILE FABRIC TYPE 9 5574.00 SY $ 5.00 $ 27,870.00 $ 3.00 $ 16,722.00 $ 3.00 $ 16,722.00 $ 2.49 $ 13,879.26 $ 2.75 $ 15,328.50 $ 2.00 $ 11,148.00 $ 3.00 $ 16,722.00

19 2118.507 AGGREGATE SURFACING CLASS 2 36.00 CY $ 45.00 $ 1,620.00 $ 60.00 $ 2,160.00 $ 30.00 $ 1,080.00 $ 73.92 $ 2,661.12 $ 68.00 $ 2,448.00 $ 25.00 $ 900.00 $ 44.00 $ 1,584.00

20 2211.507 AGGREGATE BASE (CV) CLASS 5 (P) 1167.00 CY $ 32.00 $ 37,344.00 $ 40.00 $ 46,680.00 $ 35.00 $ 40,845.00 $ 25.64 $ 29,921.88 $ 41.30 $ 48,197.10 $ 25.00 $ 29,175.00 $ 45.00 $ 52,515.00

SURFACE RESTORATION (2ND ST) 1.00 LS $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 50,000.00 $ 50,000.00 $ 58,851.30 $ 58,851.30 $ 69,500.00 $ 69,500.00 $ 60,000.00 $ 60,000.00 $ 88,000.00 $ 88,000.00

PAVEMENT MARKINGS (2ND ST) 1.00 LS $ 1,500.00 $ 1,500.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,017.29 $ 5,017.29 $ 5,090.00 $ 5,090.00 $ 4,860.00 $ 4,860.00 $ 5,500.00 $ 5,500.00

SURFACE RESTORATION (SANITARY REPAIR) 3.00 EACH $ 4,500.00 $ 13,500.00 $ 5,000.00 $ 15,000.00 $ 4,000.00 $ 12,000.00 $ 4,913.83 $ 14,741.49 $ 4,500.00 $ 13,500.00 $ 7,500.00 $ 22,500.00 $ 4,800.00 $ 14,400.00

GRAVEL RESTORATION (SANITARY REPAIR) 1.00 EACH $ 1,000.00 $ 1,000.00 $ 2,000.00 $ 2,000.00 $ 1,000.00 $ 1,000.00 $ 2,095.90 $ 2,095.90 $ 950.00 $ 950.00 $ 2,500.00 $ 2,500.00 $ 3,300.00 $ 3,300.00

25 2357.506 BITUMINOUS MATERIAL FOR TACK COAT 388.00 GAL $ 3.00 $ 1,164.00 $ 0.01 $ 3.88 $ 4.00 $ 1,552.00 $ 0.01 $ 3.88 $ 0.01 $ 3.88 $ 0.01 $ 3.88 $ 0.01 $ 3.88

26 2360.504 TYPE SP 9.5 WEARING COURSE MIXTURE (3;C) 1.5" THICK 7760.00 SY $ 10.35 $ 80,316.00 $ 7.70 $ 59,752.00 $ 9.00 $ 69,840.00 $ 8.17 $ 63,399.20 $ 8.05 $ 62,468.00 $ 7.70 $ 59,752.00 $ 9.00 $ 69,840.00

27 2360.504 TYPE SP 12.5 WEARING COURSE MIXTURE (3;C) 2.0" THICK 2807.00 SY $ 13.75 $ 38,596.25 $ 9.85 $ 27,648.95 $ 12.00 $ 33,684.00 $ 10.78 $ 30,259.46 $ 10.30 $ 28,912.10 $ 9.85 $ 27,648.95 $ 11.00 $ 30,877.00

28 2360.504 TYPE SP 12.5 WEARING COURSE MIXTURE (3;C) 2.5" THICK 2145.00 SY $ 17.25 $ 37,001.25 $ 12.45 $ 26,705.25 $ 15.00 $ 32,175.00 $ 13.67 $ 29,322.15 $ 13.05 $ 27,992.25 $ 12.45 $ 26,705.25 $ 14.00 $ 30,030.00

29 2231.604 BITUMINOUS PATCH SPECIAL (DRIVEWAY) 70.00 SY $ 75.00 $ 5,250.00 $ 50.00 $ 3,500.00 $ 50.00 $ 3,500.00 $ 44.99 $ 3,149.30 $ 52.00 $ 3,640.00 $ 30.00 $ 2,100.00 $ 54.00 $ 3,780.00

30 2502.503 6" PERF PVC PIPE DRAIN 2281.00 LF $ 20.00 $ 45,620.00 $ 17.50 $ 39,917.50 $ 15.00 $ 34,215.00 $ 15.00 $ 34,215.00 $ 18.00 $ 41,058.00 $ 20.00 $ 45,620.00 $ 22.00 $ 50,182.00

SUMP PUMP SERVICE 13.00 EACH $ 1,200.00 $ 15,600.00 $ 1,300.00 $ 16,900.00 $ 1,000.00 $ 13,000.00 $ 1,688.32 $ 21,948.16 $ 1,165.00 $ 15,145.00 $ 850.00 $ 11,050.00 $ 1,600.00 $ 20,800.00

32 2502.602 DRAIN OUTLET DESIGN SPECIAL (END SECTION) 1.00 EACH $ 1,000.00 $ 1,000.00 $ 300.00 $ 300.00 $ 2,500.00 $ 2,500.00 $ 172.06 $ 172.06 $ 650.00 $ 650.00 $ 500.00 $ 500.00 $ 300.00 $ 300.00

33 2502.602 6" PVC PIPE DRAIN CLEANOUT 7.00 EACH $ 300.00 $ 2,100.00 $ 500.00 $ 3,500.00 $ 300.00 $ 2,100.00 $ 246.05 $ 1,722.35 $ 270.00 $ 1,890.00 $ 350.00 $ 2,450.00 $ 640.00 $ 4,480.00

34 2521.518 4" CONCRETE WALK 355.00 SF $ 9.00 $ 3,195.00 $ 9.00 $ 3,195.00 $ 8.00 $ 2,840.00 $ 8.83 $ 3,134.65 $ 7.90 $ 2,804.50 $ 9.25 $ 3,283.75 $ 8.00 $ 2,840.00

35 2521.518 6" CONCRETE WALK 70.00 SF $ 13.00 $ 910.00 $ 12.00 $ 840.00 $ 22.00 $ 1,540.00 $ 16.88 $ 1,181.60 $ 16.05 $ 1,123.50 $ 14.00 $ 980.00 $ 20.00 $ 1,400.00

36 2531.503 CONCRETE CURB AND GUTTER DESIGN B618 1060.00 LF $ 20.00 $ 21,200.00 $ 23.00 $ 24,380.00 $ 22.00 $ 23,320.00 $ 25.07 $ 26,574.20 $ 29.10 $ 30,846.00 $ 25.75 $ 27,295.00 $ 27.00 $ 28,620.00

37 2531.503 CONCRETE CURB AND GUTTER DESIGN D DRIVEOVER 1910.00 LF $ 20.00 $ 38,200.00 $ 26.00 $ 49,660.00 $ 27.00 $ 51,570.00 $ 28.76 $ 54,931.60 $ 30.20 $ 57,682.00 $ 24.00 $ 45,840.00 $ 28.00 $ 53,480.00

38 2531.504 6" CONCRETE DRIVEWAY PAVEMENT 150.00 SY $ 80.00 $ 12,000.00 $ 100.00 $ 15,000.00 $ 82.00 $ 12,300.00 $ 98.52 $ 14,778.00 $ 99.00 $ 14,850.00 $ 88.50 $ 13,275.00 $ 96.00 $ 14,400.00

39 2531.504 7" CONCRETE DRIVEWAY PAVEMENT 420.00 SY $ 85.00 $ 35,700.00 $ 110.00 $ 46,200.00 $ 93.00 $ 39,060.00 $ 110.91 $ 46,582.20 $ 111.00 $ 46,620.00 $ 92.50 $ 38,850.00 $ 108.00 $ 45,360.00

40 2531.604 7" CONCRETE VALLEY GUTTER 71.00 SY $ 175.00 $ 12,425.00 $ 110.00 $ 7,810.00 $ 125.00 $ 8,875.00 $ 137.75 $ 9,780.25 $ 122.00 $ 8,662.00 $ 95.00 $ 6,745.00 $ 130.00 $ 9,230.00

41 2531.618 TRUNCATED DOMES 10.00 SF $ 60.00 $ 600.00 $ 50.00 $ 500.00 $ 32.00 $ 320.00 $ 56.78 $ 567.80 $ 58.00 $ 580.00 $ 52.50 $ 525.00 $ 63.00 $ 630.00

42 2563.601 TRAFFIC CONTROL 1.00 LS $ 30,000.00 $ 30,000.00 $ 10,000.00 $ 10,000.00 $ 20,000.00 $ 20,000.00 $ 10,272.03 $ 10,272.03 $ 10,425.00 $ 10,425.00 $ 9,950.00 $ 9,950.00 $ 22,000.00 $ 22,000.00

43 2564.602 INSTALL SIGN 6.00 EACH $ 300.00 $ 1,800.00 $ 450.00 $ 2,700.00 $ 400.00 $ 2,400.00 $ 361.33 $ 2,167.98 $ 367.00 $ 2,202.00 $ 350.00 $ 2,100.00 $ 400.00 $ 2,400.00

44 2573.501 STABILIZED CONSTRUCTION EXIT 2.00 LS $ 800.00 $ 1,600.00 $ 1,000.00 $ 2,000.00 $ 1,000.00 $ 2,000.00 $ 1,130.68 $ 2,261.36 $ 1,800.00 $ 3,600.00 $ 500.00 $ 1,000.00 $ 600.00 $ 1,200.00

45 2573.501 EROSION CONTROL SUPERVISOR 1.00 LS $ 5,000.00 $ 5,000.00 $ 500.00 $ 500.00 $ 5,000.00 $ 5,000.00 $ 3,072.52 $ 3,072.52 $ 0.01 $ 0.01 $ 1,500.00 $ 1,500.00 $ 200.00 $ 200.00

46 2573.502 STORM DRAIN INLET PROTECTION 30.00 EACH $ 450.00 $ 13,500.00 $ 100.00 $ 3,000.00 $ 200.00 $ 6,000.00 $ 111.84 $ 3,355.20 $ 260.00 $ 7,800.00 $ 100.00 $ 3,000.00 $ 200.00 $ 6,000.00

47 2573.503 SILT FENCE; TYPE MS 235.00 LF $ 3.00 $ 705.00 $ 3.00 $ 705.00 $ 4.00 $ 940.00 $ 4.13 $ 970.55 $ 4.20 $ 987.00 $ 4.00 $ 940.00 $ 4.00 $ 940.00

48 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER 240.00 LF $ 7.00 $ 1,680.00 $ 3.00 $ 720.00 $ 4.00 $ 960.00 $ 4.13 $ 991.20 $ 4.20 $ 1,008.00 $ 4.00 $ 960.00 $ 6.00 $ 1,440.00

49 2573.503 SEDIMENT CONTROL LOG TYPE ROCK 120.00 LF $ 7.00 $ 840.00 $ 3.00 $ 360.00 $ 5.00 $ 600.00 $ 4.13 $ 495.60 $ 4.20 $ 504.00 $ 20.00 $ 2,400.00 $ 8.00 $ 960.00

50 2574.507 COMPOST GRADE 2 140.00 CY $ 50.00 $ 7,000.00 $ 30.00 $ 4,200.00 $ 35.00 $ 4,900.00 $ 19.73 $ 2,762.20 $ 26.00 $ 3,640.00 $ 45.00 $ 6,300.00 $ 40.00 $ 5,600.00

51 2574.508 FERTILIZER TYPE 3 105.00 LB $ 3.00 $ 315.00 $ 1.00 $ 105.00 $ 2.00 $ 210.00 $ 1.35 $ 141.75 $ 1.35 $ 141.75 $ 1.30 $ 136.50 $ 2.00 $ 210.00

Abstract 5/12/2025, 9:40 PM Bolton & Menk, Inc. Page 1 of 5

ABSTRACT OF BIDS 2025 STREET AND UTILITY IMPROVEMENTS CITY OF KENYON, MINNESOTA BMI PROJECT NO. 24X134934

Bid Date: 4 / 2 / 2025

TIME: 11:00 AM

Engineer's Estimate ICON, LLC Wencl Construction Inc BCM Construction Inc Heselton Construction LLC Snow Contracting LLC A-1 Excavating LLC ITEM MnDOT APPROX. Bolton & Menk, Inc. Dodge Center, MN Owatonna, MN Faribault, MN Faribault, MN Byron, MN Bloomer, WI NO. SPEC NO ITEM QUANT. UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Base Bid - Surface Improvements

52 2575.504 SODDING 2515.00 SY $ 13.00 $ 32,695.00 $ 14.00 $ 35,210.00 $ 7.00 $ 17,605.00 $ 6.19 $ 15,567.85 $ 7.35 $ 18,485.25 $ 6.00 $ 15,090.00 $ 7.00 $ 17,605.00

53 2575.504 RAPID STABILIZATION METHOD 2 1258.00 SY $ 1.00 $ 1,258.00 $ 2.00 $ 2,516.00 $ 3.00 $ 3,774.00 $ 3.10 $ 3,899.80 $ 3.15 $ 3,962.70 $ 3.00 $ 3,774.00 $ 1.25 $ 1,572.50

TOPSOIL PREPARATION 2515.00 SY $ 5.00 $ 12,575.00 $ 1.00 $ 2,515.00 $ 3.00 $ 7,545.00 $ 3.85 $ 9,682.75 $ 5.80 $ 14,587.00 $ 1.00 $ 2,515.00 $ 5.00 $ 12,575.00

TURF MAINTENANCE 1.00 LS $ 30,000.00 $ 30,000.00 $ 0.01 $ 0.01 $ 5,000.00 $ 5,000.00 $ 103.24 $ 103.24 $ 105.00 $ 105.00 $ 100.00 $ 100.00 $ 1,000.00 $ 1,000.00

TURF RESTORATION (2ND ST) 1.00 LS $ 15,000.00 $ 15,000.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 10,913.57 $ 10,913.57 $ 3,000.00 $ 3,000.00 $ 10,000.00 $ 10,000.00 $ 2,000.00 $ 2,000.00

CONSTRUCTION ALLOWANCE 30000.00 UNIT $ 1.00 $ 30,000.00 $ 1.00 $ 30,000.00 $ 1.00 $ 30,000.00 $ 1.00 $ 30,000.00 $ 1.00 $ 30,000.00 $ 1.00 $ 30,000.00 $ 1.00 $ 30,000.00

Base Bid - Sanitary Sewer Improvements

58 2104.502 REMOVE MANHOLE (SANITARY) 2.00 EACH $ 600.00 $ 1,200.00 $ 700.00 $ 1,400.00 $ 300.00 $ 600.00 $ 353.54 $ 707.08 $ 275.00 $ 550.00 $ 600.00 $ 1,200.00 $ 600.00 $ 1,200.00

59 2104.503 REMOVE SEWER PIPE (SANITARY) 340.00 LF $ 6.00 $ 2,040.00 $ 5.00 $ 1,700.00 $ 5.00 $ 1,700.00 $ 5.89 $ 2,002.60 $ 2.25 $ 765.00 $ 1.00 $ 340.00 $ 6.00 $ 2,040.00

60 2503.602 CONNECT TO EXISTING SANITARY SEWER 1.00 EACH $ 3,000.00 $ 3,000.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 877.30 $ 877.30 $ 1,050.00 $ 1,050.00 $ 1,000.00 $ 1,000.00 $ 1,900.00 $ 1,900.00

61 2503.602 8"X6" PVC WYE 12.00 EACH $ 485.00 $ 5,820.00 $ 375.00 $ 4,500.00 $ 500.00 $ 6,000.00 $ 369.93 $ 4,439.16 $ 500.00 $ 6,000.00 $ 425.00 $ 5,100.00 $ 400.00 $ 4,800.00

62 2503.603 8" PVC PIPE SEWER 424.00 LF $ 80.00 $ 33,920.00 $ 70.00 $ 29,680.00 $ 70.00 $ 29,680.00 $ 63.11 $ 26,758.64 $ 66.50 $ 28,196.00 $ 65.00 $ 27,560.00 $ 65.00 $ 27,560.00

63 2503.603 6" PVC SANITARY SERVICE PIPE 400.00 LF $ 55.00 $ 22,000.00 $ 34.00 $ 13,600.00 $ 50.00 $ 20,000.00 $ 41.28 $ 16,512.00 $ 48.00 $ 19,200.00 $ 55.00 $ 22,000.00 $ 78.00 $ 31,200.00

64 2" PE PRESSURE SEWER SERVICE 105.00 LF $ 50.00 $ 5,250.00 $ 31.00 $ 3,255.00 $ 50.00 $ 5,250.00 $ 45.92 $ 4,821.60 $ 54.65 $ 5,738.25 $ 35.00 $ 3,675.00 $ 58.00 $ 6,090.00

65 2503.603 LINING SEWER PIPE 8" 3648.00 LF $ 50.00 $ 182,400.00 $ 41.00 $ 149,568.00 $ 45.00 $ 164,160.00 $ 42.33 $ 154,419.84 $ 43.00 $ 156,864.00 $ 41.00 $ 149,568.00 $ 47.00 $ 171,456.00

66 2506.502 CASTING ASSEMBLY (SANITARY) 2.00 EACH $ 2,000.00 $ 4,000.00 $ 1,700.00 $ 3,400.00 $ 1,200.00 $ 2,400.00 $ 1,223.80 $ 2,447.60 $ 1,530.00 $ 3,060.00 $ 1,000.00 $ 2,000.00 $ 1,400.00 $ 2,800.00

67 2506.502 FINAL CASTING ADJUSTMENT (DONUT CUT) 5.00 EACH $ 2,500.00 $ 12,500.00 $ 3,000.00 $ 15,000.00 $ 2,500.00 $ 12,500.00 $ 1,510.75 $ 7,553.75 $ 2,635.00 $ 13,175.00 $ 2,500.00 $ 12,500.00 $ 1,200.00 $ 6,000.00

68 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 4007 14.70 LF $ 750.00 $ 11,025.00 $ 750.00 $ 11,025.00 $ 500.00 $ 7,350.00 $ 524.17 $ 7,705.30 $ 580.00 $ 8,526.00 $ 475.00 $ 6,982.50 $ 700.00 $ 10,290.00

SANITARY LATERAL REINSTATEMENT 56.00 EACH $ 200.00 $ 11,200.00 $ 100.00 $ 5,600.00 $ 60.00 $ 3,360.00 $ 103.24 $ 5,781.44 $ 105.00 $ 5,880.00 $ 100.00 $ 5,600.00 $ 120.00 $ 6,720.00

TRIMMING PROTRUDING TAPS 7.00 EACH $ 350.00 $ 2,450.00 $ 200.00 $ 1,400.00 $ 1,200.00 $ 8,400.00 $ 180.66 $ 1,264.62 $ 184.00 $ 1,288.00 $ 175.00 $ 1,225.00 $ 200.00 $ 1,400.00

SANITARY LATERAL GROUTING 56.00 EACH $ 1,200.00 $ 67,200.00 $ 450.00 $ 25,200.00 $ 425.00 $ 23,800.00 $ 457.19 $ 25,602.64 $ 445.00 $ 24,920.00 $ 425.00 $ 23,800.00 $ 500.00 $ 28,000.00

71B LATERAL CLEANING 28.00 EACH $ 450.00 $ 12,600.00 $ 500.00 $ 14,000.00 $ 500.00 $ 14,000.00 $ 516.18 $ 14,453.04 $ 550.00 $ 15,400.00 $ 500.00 $ 14,000.00 $ 575.00 $ 16,100.00

ROOT CUTTING 1200.00 LF $ 5.00 $ 6,000.00 $ 2.00 $ 2,400.00 $ 3.00 $ 3,600.00 $ 2.06 $ 2,472.00 $ 2.10 $ 2,520.00 $ 2.00 $ 2,400.00 $ 2.50 $ 3,000.00

SANITARY MANHOLE REHABILITATION (SPRAY-ON) 9.00 EACH $ 2,900.00 $ 26,100.00 $ 4,000.00 $ 36,000.00 $ 5,000.00 $ 45,000.00 $ 3,881.68 $ 34,935.12 $ 3,940.00 $ 35,460.00 $ 3,760.00 $ 33,840.00 $ 4,400.00 $ 39,600.00

SANITARY SEWER BYPASSING 1.00 LS $ 10,000.00 $ 10,000.00 $ 15,000.00 $ 15,000.00 $ 5,000.00 $ 5,000.00 $ 1,548.54 $ 1,548.54 $ 1,570.00 $ 1,570.00 $ 1,500.00 $ 1,500.00 $ 3,400.00 $ 3,400.00

POINT REPAIR - SANITARY SEWER PIPE 4.00 EACH $ 2,500.00 $ 10,000.00 $ 4,600.00 $ 18,400.00 $ 2,400.00 $ 9,600.00 $ 4,729.31 $ 18,917.24 $ 950.00 $ 3,800.00 $ 10,000.00 $ 40,000.00 $ 4,000.00 $ 16,000.00

INTERNAL POINT REPAIR (SHORT LINER) 3.00 EACH $ 5,000.00 $ 15,000.00 $ 1,500.00 $ 4,500.00 $ 2,000.00 $ 6,000.00 $ 2,064.72 $ 6,194.16 $ 2,095.00 $ 6,285.00 $ 2,000.00 $ 6,000.00 $ 2,300.00 $ 6,900.00

INTERNAL CHIMNEY SEAL (REHAB) 7.00 EACH $ 850.00 $ 5,950.00 $ 1,500.00 $ 10,500.00 $ 700.00 $ 4,900.00 $ 671.04 $ 4,697.28 $ 840.00 $ 5,880.00 $ 1,500.00 $ 10,500.00 $ 1,000.00 $ 7,000.00

REPLACE & ADJUST RING AND CASTING 3.00 EACH $ 900.00 $ 2,700.00 $ 1,700.00 $ 5,100.00 $ 1,500.00 $ 4,500.00 $ 1,223.80 $ 3,671.40 $ 1,530.00 $ 4,590.00 $ 750.00 $ 2,250.00 $ 1,400.00 $ 4,200.00

SANITARY SEWER TRACER SYSTEM 1.00 LS $ 3,000.00 $ 3,000.00 $ 0.01 $ 0.01 $ 5,000.00 $ 5,000.00 $ 2,698.90 $ 2,698.90 $ 2,970.00 $ 2,970.00 $ 3,500.00 $ 3,500.00 $ 1.00 $ 1.00

Base Bid - Water System Improvements

80 2104.502 REMOVE GATE VALVE AND BOX 16.00 EACH $ 250.00 $ 4,000.00 $ 50.00 $ 800.00 $ 300.00 $ 4,800.00 $ 316.59 $ 5,065.44 $ 380.00 $ 6,080.00 $ 250.00 $ 4,000.00 $ 300.00 $ 4,800.00

81 2104.502 REMOVE CURB STOP AND BOX 22.00 EACH $ 250.00 $ 5,500.00 $ 50.00 $ 1,100.00 $ 100.00 $ 2,200.00 $ 259.24 $ 5,703.28 $ 190.00 $ 4,180.00 $ 100.00 $ 2,200.00 $ 150.00 $ 3,300.00

82 2104.502 REMOVE HYDRANT 6.00 EACH $ 500.00 $ 3,000.00 $ 300.00 $ 1,800.00 $ 500.00 $ 3,000.00 $ 488.65 $ 2,931.90 $ 755.00 $ 4,530.00 $ 350.00 $ 2,100.00 $ 450.00 $ 2,700.00

83 2104.503 REMOVE WATER MAIN 1806.00 LF $ 8.00 $ 14,448.00 $ 5.00 $ 9,030.00 $ 3.00 $ 5,418.00 $ 5.30 $ 9,571.80 $ 5.00 $ 9,030.00 $ 1.00 $ 1,806.00 $ 7.00 $ 12,642.00

84 2106.507 EXCAVATION - ROCK 100.00 CY $ 110.00 $ 11,000.00 $ 0.01 $ 1.00 $ 70.00 $ 7,000.00 $ 81.12 $ 8,112.00 $ 105.00 $ 10,500.00 $ 1.00 $ 100.00 $ 40.00 $ 4,000.00

85 2504.601 TEMPORARY WATER SERVICE 1.00 LS $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 18,926.59 $ 18,926.59 $ 26,500.00 $ 26,500.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00

86 2504.602 CONNECT TO EXISTING WATER MAIN 12.00 EACH $ 1,600.00 $ 19,200.00 $ 1,350.00 $ 16,200.00 $ 1,500.00 $ 18,000.00 $ 850.46 $ 10,205.52 $ 1,900.00 $ 22,800.00 $ 1,500.00 $ 18,000.00 $ 2,000.00 $ 24,000.00

87 2504.602 DISCONNECT EXISTING WATER MAIN (P) 3.00 EACH $ 1,600.00 $ 4,800.00 $ 950.00 $ 2,850.00 $ 1,000.00 $ 3,000.00 $ 1,052.74 $ 3,158.22 $ 300.00 $ 900.00 $ 750.00 $ 2,250.00 $ 600.00 $ 1,800.00

88 2504.602 HYDRANT (8.0' BURY) 5.00 EACH $ 6,700.00 $ 33,500.00 $ 7,500.00 $ 37,500.00 $ 6,500.00 $ 32,500.00 $ 6,352.29 $ 31,761.45 $ 7,065.00 $ 35,325.00 $ 6,500.00 $ 32,500.00 $ 7,500.00 $ 37,500.00

89 2504.602 HYDRANT (11' BURY) 1.00 EACH $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 6,700.00 $ 6,700.00 $ 6,971.73 $ 6,971.73 $ 10,500.00 $ 10,500.00 $ 7,200.00 $ 7,200.00 $ 8,800.00 $ 8,800.00

90 2504.602 ADJUST VALVE BOX 18.00 EACH $ 300.00 $ 5,400.00 $ 500.00 $ 9,000.00 $ 300.00 $ 5,400.00 $ 286.76 $ 5,161.68 $ 295.00 $ 5,310.00 $ 350.00 $ 6,300.00 $ 300.00 $ 5,400.00

91 2504.602 1" CORPORATION STOP 27.00 EACH $ 500.00 $ 13,500.00 $ 300.00 $ 8,100.00 $ 500.00 $ 13,500.00 $ 586.91 $ 15,846.57 $ 320.00 $ 8,640.00 $ 450.00 $ 12,150.00 $ 440.00 $ 11,880.00

92 2504.602 6" GATE VALVE AND BOX 16.00 EACH $ 3,700.00 $ 59,200.00 $ 2,700.00 $ 43,200.00 $ 2,800.00 $ 44,800.00 $ 2,350.91 $ 37,614.56 $ 2,455.00 $ 39,280.00 $ 2,750.00 $ 44,000.00 $ 2,600.00 $ 41,600.00

93 2504.602 8" GATE VALVE AND BOX 2.00 EACH $ 4,500.00 $ 9,000.00 $ 4,500.00 $ 9,000.00 $ 3,500.00 $ 7,000.00 $ 3,223.26 $ 6,446.52 $ 3,300.00 $ 6,600.00 $ 3,750.00 $ 7,500.00 $ 3,600.00 $ 7,200.00

94 2504.602 10" GATE VALVE AND BOX 2.00 EACH $ 5,500.00 $ 11,000.00 $ 6,500.00 $ 13,000.00 $ 5,000.00 $ 10,000.00 $ 4,771.81 $ 9,543.62 $ 5,185.00 $ 10,370.00 $ 5,250.00 $ 10,500.00 $ 5,400.00 $ 10,800.00

95 2504.602 1" CURB STOP AND BOX 27.00 EACH $ 650.00 $ 17,550.00 $ 500.00 $ 13,500.00 $ 500.00 $ 13,500.00 $ 674.66 $ 18,215.82 $ 440.00 $ 11,880.00 $ 725.00 $ 19,575.00 $ 500.00 $ 13,500.00

96 2504.603 1" TYPE PE PIPE 765.00 LF $ 45.00 $ 34,425.00 $ 33.00 $ 25,245.00 $ 40.00 $ 30,600.00 $ 34.86 $ 26,667.90 $ 46.00 $ 35,190.00 $ 25.00 $ 19,125.00 $ 70.00 $ 53,550.00

DIRECTIONAL DRILL SERVICE BELOW CSAH 12 2.00 EACH $ 3,000.00 $ 6,000.00 $ 5,000.00 $ 10,000.00 $ 3,000.00 $ 6,000.00 $ 4,707.61 $ 9,415.22 $ 5,675.00 $ 11,350.00 $ 7,500.00 $ 15,000.00 $ 5,200.00 $ 10,400.00

98 2504.603 6" PVC WATERMAIN 65.00 LF $ 75.00 $ 4,875.00 $ 45.00 $ 2,925.00 $ 50.00 $ 3,250.00 $ 56.43 $ 3,667.95 $ 59.00 $ 3,835.00 $ 65.00 $ 4,225.00 $ 96.00 $ 6,240.00

99 2504.603 8" PVC WATERMAIN 645.00 LF $ 80.00 $ 51,600.00 $ 50.00 $ 32,250.00 $ 60.00 $ 38,700.00 $ 68.80 $ 44,376.00 $ 65.00 $ 41,925.00 $ 70.00 $ 45,150.00 $ 71.00 $ 45,795.00

Abstract 5/12/2025, 9:40 PM Bolton & Menk, Inc. Page 2 of 5

ABSTRACT OF BIDS 2025 STREET AND UTILITY IMPROVEMENTS CITY OF KENYON, MINNESOTA BMI PROJECT NO. 24X134934

Bid Date: 4 / 2 / 2025

TIME: 11:00 AM

Engineer's Estimate ICON, LLC Wencl Construction Inc BCM Construction Inc Heselton Construction LLC Snow Contracting LLC A-1 Excavating LLC ITEM MnDOT APPROX. Bolton & Menk, Inc. Dodge Center, MN Owatonna, MN Faribault, MN Faribault, MN Byron, MN Bloomer, WI NO. SPEC NO ITEM QUANT. UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Base Bid - Surface Improvements

100 2504.603 10" PVC WATERMAIN 1130.00 LF $ 92.00 $ 103,960.00 $ 75.00 $ 84,750.00 $ 75.00 $ 84,750.00 $ 79.26 $ 89,563.80 $ 76.00 $ 85,880.00 $ 75.00 $ 84,750.00 $ 84.00 $ 94,920.00

101 2504.603 10" PVC WATERMAIN (DIRECTIONAL DRILLED) 780.00 LF $ 200.00 $ 156,000.00 $ 205.00 $ 159,900.00 $ 145.00 $ 113,100.00 $ 205.27 $ 160,110.60 $ 218.50 $ 170,430.00 $ 225.00 $ 175,500.00 $ 230.00 $ 179,400.00

102 2504.604 4" INSULATION 99.00 SY $ 45.00 $ 4,455.00 $ 90.00 $ 8,910.00 $ 40.00 $ 3,960.00 $ 76.48 $ 7,571.52 $ 42.50 $ 4,207.50 $ 50.00 $ 4,950.00 $ 84.00 $ 8,316.00

103 2504.608 WATERMAIN FITTINGS 2992.00 LB $ 18.00 $ 53,856.00 $ 15.00 $ 44,880.00 $ 15.00 $ 44,880.00 $ 15.26 $ 45,657.92 $ 15.25 $ 45,628.00 $ 15.00 $ 44,880.00 $ 18.00 $ 53,856.00

104 VALVE BOX TOP SECTION & CAP 1.00 EACH $ 300.00 $ 300.00 $ 500.00 $ 500.00 $ 200.00 $ 200.00 $ 488.65 $ 488.65 $ 195.00 $ 195.00 $ 250.00 $ 250.00 $ 200.00 $ 200.00

105 WATERMAIN TRACER SYSTEM 1.00 LS $ 5,500.00 $ 5,500.00 $ 0.01 $ 0.01 $ 5,000.00 $ 5,000.00 $ 6,390.83 $ 6,390.83 $ 7,050.00 $ 7,050.00 $ 7,500.00 $ 7,500.00 $ 1.00 $ 1.00

Base Bid - Storm Sewer Improvements

106 2104.502 REMOVE PIPE APRON 1.00 EACH $ 500.00 $ 500.00 $ 300.00 $ 300.00 $ 200.00 $ 200.00 $ 530.31 $ 530.31 $ 300.00 $ 300.00 $ 250.00 $ 250.00 $ 300.00 $ 300.00

107 2104.502 REMOVE MANHOLE OR CATCH BASIN 1.00 EACH $ 650.00 $ 650.00 $ 400.00 $ 400.00 $ 500.00 $ 500.00 $ 265.16 $ 265.16 $ 450.00 $ 450.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00

108 2104.503 REMOVE SEWER PIPE (STORM) 118.00 LF $ 20.00 $ 2,360.00 $ 20.00 $ 2,360.00 $ 5.00 $ 590.00 $ 9.91 $ 1,169.38 $ 10.00 $ 1,180.00 $ 20.00 $ 2,360.00 $ 17.00 $ 2,006.00

109 2104.502 SALVAGE CASTING 1.00 EACH $ 150.00 $ 150.00 $ 50.00 $ 50.00 $ 100.00 $ 100.00 $ 232.89 $ 232.89 $ 125.00 $ 125.00 $ 250.00 $ 250.00 $ 500.00 $ 500.00

110 2501.502 24" RC PIPE APRON 1.00 EACH $ 1,000.00 $ 1,000.00 $ 4,500.00 $ 4,500.00 $ 1,500.00 $ 1,500.00 $ 1,431.54 $ 1,431.54 $ 1,775.00 $ 1,775.00 $ 1,350.00 $ 1,350.00 $ 1,400.00 $ 1,400.00

111 2501.602 TRASH GUARD FOR 24" PIPE APRON 1.00 EACH $ 700.00 $ 700.00 $ 0.01 $ 0.01 $ 1,500.00 $ 1,500.00 $ 1,127.00 $ 1,127.00 $ 0.01 $ 0.01 $ 1,800.00 $ 1,800.00 $ 1,200.00 $ 1,200.00

112 2503.503 24" RC PIPE SEWER DESIGN 3006 CLASS III 40.00 LF $ 120.00 $ 4,800.00 $ 110.00 $ 4,400.00 $ 100.00 $ 4,000.00 $ 112.70 $ 4,508.00 $ 118.00 $ 4,720.00 $ 90.00 $ 3,600.00 $ 150.00 $ 6,000.00

113 2503.602 CONNECT TO EXISTING STORM SEWER 1.00 EACH $ 1,250.00 $ 1,250.00 $ 900.00 $ 900.00 $ 1,500.00 $ 1,500.00 $ 964.02 $ 964.02 $ 1,220.00 $ 1,220.00 $ 1,500.00 $ 1,500.00 $ 1,200.00 $ 1,200.00

114 2503.602 CONNECT TO EXISTING DRAINAGE STRUCTURE 2.00 EACH $ 1,250.00 $ 2,500.00 $ 900.00 $ 1,800.00 $ 1,500.00 $ 3,000.00 $ 1,503.45 $ 3,006.90 $ 2,100.00 $ 4,200.00 $ 1,500.00 $ 3,000.00 $ 1,100.00 $ 2,200.00

115 2503.603 12" PIPE SEWER 81.00 LF $ 60.00 $ 4,860.00 $ 45.00 $ 3,645.00 $ 60.00 $ 4,860.00 $ 56.97 $ 4,614.57 $ 58.50 $ 4,738.50 $ 50.00 $ 4,050.00 $ 106.00 $ 8,586.00

116 2503.603 18" PIPE SEWER 732.00 LF $ 70.00 $ 51,240.00 $ 50.00 $ 36,600.00 $ 75.00 $ 54,900.00 $ 53.13 $ 38,891.16 $ 52.00 $ 38,064.00 $ 55.00 $ 40,260.00 $ 88.00 $ 64,416.00

117 2503.603 24" PIPE SEWER 219.00 LF $ 100.00 $ 21,900.00 $ 60.00 $ 13,140.00 $ 100.00 $ 21,900.00 $ 68.07 $ 14,907.33 $ 88.00 $ 19,272.00 $ 60.00 $ 13,140.00 $ 110.00 $ 24,090.00

118 2506.502 CASTING ASSEMBLY (STORM) 13.00 EACH $ 1,200.00 $ 15,600.00 $ 1,000.00 $ 13,000.00 $ 1,500.00 $ 19,500.00 $ 1,223.80 $ 15,909.40 $ 1,105.00 $ 14,365.00 $ 1,000.00 $ 13,000.00 $ 1,400.00 $ 18,200.00

119 2506.502 FINAL CASTING ADJUSTMENT (DONUT CUT) 4.00 EACH $ 2,500.00 $ 10,000.00 $ 3,000.00 $ 12,000.00 $ 1,500.00 $ 6,000.00 $ 1,510.75 $ 6,043.00 $ 2,600.00 $ 10,400.00 $ 2,500.00 $ 10,000.00 $ 1,300.00 $ 5,200.00

120 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL (R-1) 21.00 LF $ 750.00 $ 15,750.00 $ 665.00 $ 13,965.00 $ 500.00 $ 10,500.00 $ 486.41 $ 10,214.61 $ 635.00 $ 13,335.00 $ 375.00 $ 7,875.00 $ 650.00 $ 13,650.00

121 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 10.20 LF $ 1,000.00 $ 10,200.00 $ 765.00 $ 7,803.00 $ 600.00 $ 6,120.00 $ 432.00 $ 4,406.40 $ 627.00 $ 6,395.40 $ 475.00 $ 4,845.00 $ 650.00 $ 6,630.00

122 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 54-4020 9.00 LF $ 1,200.00 $ 10,800.00 $ 1,065.00 $ 9,585.00 $ 900.00 $ 8,100.00 $ 512.00 $ 4,608.00 $ 985.00 $ 8,865.00 $ 800.00 $ 7,200.00 $ 1,000.00 $ 9,000.00

123 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4022 4.60 LF $ 1,000.00 $ 4,600.00 $ 765.00 $ 3,519.00 $ 1,200.00 $ 5,520.00 $ 432.00 $ 1,987.20 $ 635.00 $ 2,921.00 $ 475.00 $ 2,185.00 $ 700.00 $ 3,220.00

124 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4022 6.30 LF $ 1,350.00 $ 8,505.00 $ 1,065.00 $ 6,709.50 $ 1,200.00 $ 7,560.00 $ 777.44 $ 4,897.87 $ 813.00 $ 5,121.90 $ 700.00 $ 4,410.00 $ 950.00 $ 5,985.00

125 2506.503 RECONSTRUCT DRAINAGE STRUCTURE 9.90 LF $ 1,300.00 $ 12,870.00 $ 800.00 $ 7,920.00 $ 400.00 $ 3,960.00 $ 734.12 $ 7,267.79 $ 1,000.00 $ 9,900.00 $ 750.00 $ 7,425.00 $ 750.00 $ 7,425.00

TOTAL BASE BID AMOUNT: $ 2,316,763.50 $ 1,800,032.48 $ 1,841,247.00 $ 1,841,550.67 $ 1,966,563.85 $ 2,054,391.83 $ 2,225,450.38

Alternate 1 - 5Th Street

1001 2021.501 MOBILIZATION (5TH ST) 1.00 LS $ 25,000.00 $ 25,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 8,700.00 $ 8,700.00 $ 20,000.00 $ 20,000.00 $ 21,000.00 $ 21,000.00

1002 2104.502 SALVAGE SIGN 1.00 EACH $ 100.00 $ 100.00 $ 150.00 $ 150.00 $ 100.00 $ 100.00 $ 51.62 $ 51.62 $ 53.00 $ 53.00 $ 50.00 $ 50.00 $ 60.00 $ 60.00

1003 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 516.00 LF $ 6.00 $ 3,096.00 $ 1.00 $ 516.00 $ 5.00 $ 2,580.00 $ 3.92 $ 2,022.72 $ 3.00 $ 1,548.00 $ 3.00 $ 1,548.00 $ 3.00 $ 1,548.00

1004 2104.503 REMOVE CURB & GUTTER 315.00 LF $ 4.00 $ 1,260.00 $ 5.00 $ 1,575.00 $ 10.00 $ 3,150.00 $ 3.72 $ 1,171.80 $ 4.00 $ 1,260.00 $ 5.00 $ 1,575.00 $ 6.00 $ 1,890.00

1005 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT 34.00 SY $ 9.00 $ 306.00 $ 6.00 $ 204.00 $ 5.00 $ 170.00 $ 7.83 $ 266.22 $ 10.20 $ 346.80 $ 5.00 $ 170.00 $ 10.00 $ 340.00

1006 2104.504 REMOVE BITUMINOUS PAVEMENT 1541.00 SY $ 5.00 $ 7,705.00 $ 4.00 $ 6,164.00 $ 5.00 $ 7,705.00 $ 3.53 $ 5,439.73 $ 5.70 $ 8,783.70 $ 5.00 $ 7,705.00 $ 4.00 $ 6,164.00

1007 2106.507 EXCAVATION - COMMON (P) 1216.00 CY $ 22.00 $ 26,752.00 $ 20.00 $ 24,320.00 $ 20.00 $ 24,320.00 $ 12.00 $ 14,592.00 $ 13.00 $ 15,808.00 $ 12.00 $ 14,592.00 $ 17.00 $ 20,672.00

1008 2106.507 EXCAVATION - SUBGRADE (P) 347.00 CY $ 22.00 $ 7,634.00 $ 20.00 $ 6,940.00 $ 20.00 $ 6,940.00 $ 12.00 $ 4,164.00 $ 13.00 $ 4,511.00 $ 12.00 $ 4,164.00 $ 17.00 $ 5,899.00

1009 2106.507 EXCAVATION - MUCK 235.00 CY $ 7.00 $ 1,645.00 $ 0.01 $ 2.35 $ 20.00 $ 4,700.00 $ 8.00 $ 1,880.00 $ 13.00 $ 3,055.00 $ 15.00 $ 3,525.00 $ 17.00 $ 3,995.00

1010 2106.507 SELECT GRANULAR EMBANKMENT (CV) (P) 347.00 CY $ 25.00 $ 8,675.00 $ 37.00 $ 12,839.00 $ 35.00 $ 12,145.00 $ 26.75 $ 9,282.25 $ 29.00 $ 10,063.00 $ 25.00 $ 8,675.00 $ 48.00 $ 16,656.00

1011 2106.507 STABILIZING AGGREGATE (CV) 235.00 CY $ 30.00 $ 7,050.00 $ 0.01 $ 2.35 $ 40.00 $ 9,400.00 $ 26.24 $ 6,166.40 $ 42.00 $ 9,870.00 $ 40.00 $ 9,400.00 $ 48.00 $ 11,280.00

1012 2108.504 GEOTEXTILE FABRIC TYPE 9 2847.00 SY $ 5.00 $ 14,235.00 $ 3.00 $ 8,541.00 $ 2.00 $ 5,694.00 $ 2.49 $ 7,089.03 $ 2.75 $ 7,829.25 $ 2.00 $ 5,694.00 $ 3.00 $ 8,541.00

1013 2211.507 AGGREGATE BASE (CV) CLASS 5 (P) 526.00 CY $ 32.00 $ 16,832.00 $ 46.00 $ 24,196.00 $ 40.00 $ 21,040.00 $ 25.74 $ 13,539.24 $ 41.00 $ 21,566.00 $ 25.00 $ 13,150.00 $ 50.00 $ 26,300.00

1014 2357.506 BITUMINOUS MATERIAL FOR TACK COAT 178.00 GAL $ 3.00 $ 534.00 $ 0.01 $ 1.78 $ 1.00 $ 178.00 $ 0.01 $ 1.78 $ 0.01 $ 1.78 $ 0.01 $ 1.78 $ 0.01 $ 1.78

1015 2360.504 TYPE SP 9.5 WEARING COURSE MIXTURE (3;C) 1.5" THICK 3553.00 SY $ 10.35 $ 36,773.55 $ 7.95 $ 28,246.35 $ 12.00 $ 42,636.00 $ 9.01 $ 32,012.53 $ 8.35 $ 29,667.55 $ 8.60 $ 30,555.80 $ 9.00 $ 31,977.00

1016 2360.504 TYPE SP 12.5 WEARING COURSE MIXTURE (3;C) 2.0" THICK 1777.00 SY $ 13.75 $ 24,433.75 $ 10.15 $ 18,036.55 $ 14.00 $ 24,878.00 $ 11.77 $ 20,915.29 $ 10.65 $ 18,925.05 $ 11.42 $ 20,293.34 $ 12.00 $ 21,324.00

1017 2231.604 BITUMINOUS PATCH SPECIAL (DRIVEWAY) 25.00 SY $ 75.00 $ 1,875.00 $ 50.00 $ 1,250.00 $ 50.00 $ 1,250.00 $ 44.99 $ 1,124.75 $ 52.85 $ 1,321.25 $ 30.00 $ 750.00 $ 63.00 $ 1,575.00

1018 2502.503 6" PERF PVC PIPE DRAIN 795.00 LF $ 20.00 $ 15,900.00 $ 18.50 $ 14,707.50 $ 20.00 $ 15,900.00 $ 15.00 $ 11,925.00 $ 18.00 $ 14,310.00 $ 20.00 $ 15,900.00 $ 22.00 $ 17,490.00

1019 2502.602 6" PVC PIPE DRAIN CLEANOUT 4.00 EACH $ 300.00 $ 1,200.00 $ 300.00 $ 1,200.00 $ 300.00 $ 1,200.00 $ 246.05 $ 984.20 $ 270.00 $ 1,080.00 $ 350.00 $ 1,400.00 $ 650.00 $ 2,600.00

1020 2521.518 4" CONCRETE WALK 3535.00 SF $ 9.00 $ 31,815.00 $ 10.00 $ 35,350.00 $ 10.00 $ 35,350.00 $ 7.95 $ 28,103.25 $ 7.90 $ 27,926.50 $ 9.25 $ 32,698.75 $ 8.00 $ 28,280.00

1021 2521.518 6" CONCRETE WALK 335.00 SF $ 13.00 $ 4,355.00 $ 12.00 $ 4,020.00 $ 15.00 $ 5,025.00 $ 16.21 $ 5,430.35 $ 16.10 $ 5,393.50 $ 14.00 $ 4,690.00 $ 18.00 $ 6,030.00

1022 2531.618 TRUNCATED DOMES 90.00 SF $ 60.00 $ 5,400.00 $ 50.00 $ 4,500.00 $ 32.00 $ 2,880.00 $ 56.78 $ 5,110.20 $ 58.00 $ 5,220.00 $ 52.50 $ 4,725.00 $ 63.00 $ 5,670.00

Abstract 5/12/2025, 9:40 PM Bolton & Menk, Inc. Page 3 of 5

ABSTRACT OF BIDS 2025 STREET AND UTILITY IMPROVEMENTS CITY OF KENYON, MINNESOTA BMI PROJECT NO. 24X134934

Bid Date: 4 / 2 / 2025

TIME: 11:00 AM

Engineer's Estimate ICON, LLC Wencl Construction Inc BCM Construction Inc Heselton Construction LLC Snow Contracting LLC A-1 Excavating LLC ITEM MnDOT APPROX. Bolton & Menk, Inc. Dodge Center, MN Owatonna, MN Faribault, MN Faribault, MN Byron, MN Bloomer, WI NO. SPEC NO ITEM QUANT. UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Base Bid - Surface Improvements

1023 2531.503 CONCRETE CURB AND GUTTER DESIGN B618 855.00 LF $ 20.00 $ 17,100.00 $ 30.00 $ 25,650.00 $ 25.00 $ 21,375.00 $ 24.04 $ 20,554.20 $ 27.75 $ 23,726.25 $ 25.75 $ 22,016.25 $ 25.00 $ 21,375.00

1024 2531.604 7" CONCRETE VALLEY GUTTER 117.00 SY $ 175.00 $ 20,475.00 $ 100.00 $ 11,700.00 $ 124.00 $ 14,508.00 $ 137.75 $ 16,116.75 $ 121.70 $ 14,238.90 $ 95.00 $ 11,115.00 $ 130.00 $ 15,210.00

1025 2531.504 7" CONCRETE DRIVEWAY PAVEMENT (COMMERCIAL) 40.00 SY $ 85.00 $ 3,400.00 $ 100.00 $ 4,000.00 $ 94.00 $ 3,760.00 $ 110.91 $ 4,436.40 $ 113.25 $ 4,530.00 $ 92.50 $ 3,700.00 $ 117.00 $ 4,680.00

1026 2531.603 CONCRETE SILL 420.00 LF $ 10.00 $ 4,200.00 $ 10.00 $ 4,200.00 $ 11.00 $ 4,620.00 $ 7.08 $ 2,973.60 $ 3.15 $ 1,323.00 $ 10.00 $ 4,200.00 $ 4.00 $ 1,680.00

1027 2563.601 TRAFFIC CONTROL (5TH ST) 1.00 LS $ 5,000.00 $ 5,000.00 $ 1,500.00 $ 1,500.00 $ 10,000.00 $ 10,000.00 $ 1,548.54 $ 1,548.54 $ 1,570.00 $ 1,570.00 $ 1,500.00 $ 1,500.00 $ 1,700.00 $ 1,700.00

1028 2564.602 INSTALL SIGN 1.00 EACH $ 300.00 $ 300.00 $ 450.00 $ 450.00 $ 400.00 $ 400.00 $ 361.33 $ 361.33 $ 367.00 $ 367.00 $ 350.00 $ 350.00 $ 400.00 $ 400.00

1029 2573.501 STABILIZED CONSTRUCTION EXIT 1.00 LS $ 800.00 $ 800.00 $ 1,000.00 $ 1,000.00 $ 1,500.00 $ 1,500.00 $ 5,555.11 $ 5,555.11 $ 1,080.00 $ 1,080.00 $ 500.00 $ 500.00 $ 200.00 $ 200.00

1030 2573.502 STORM DRAIN INLET PROTECTION 9.00 EACH $ 450.00 $ 4,050.00 $ 100.00 $ 900.00 $ 300.00 $ 2,700.00 $ 111.84 $ 1,006.56 $ 260.00 $ 2,340.00 $ 100.00 $ 900.00 $ 200.00 $ 1,800.00

1031 2573.503 SILT FENCE; TYPE MS 523.00 LF $ 3.00 $ 1,569.00 $ 3.00 $ 1,569.00 $ 4.00 $ 2,092.00 $ 4.13 $ 2,159.99 $ 4.20 $ 2,196.60 $ 4.00 $ 2,092.00 $ 3.00 $ 1,569.00

1032 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER 60.00 LF $ 7.00 $ 420.00 $ 3.00 $ 180.00 $ 5.00 $ 300.00 $ 4.13 $ 247.80 $ 4.20 $ 252.00 $ 4.00 $ 240.00 $ 6.00 $ 360.00

1033 2573.503 SEDIMENT CONTROL LOG TYPE ROCK 40.00 LF $ 7.00 $ 280.00 $ 3.00 $ 120.00 $ 5.00 $ 200.00 $ 4.13 $ 165.20 $ 4.20 $ 168.00 $ 20.00 $ 800.00 $ 8.00 $ 320.00

1034 2574.507 COMPOST GRADE 2 39.00 CY $ 50.00 $ 1,950.00 $ 40.00 $ 1,560.00 $ 35.00 $ 1,365.00 $ 19.73 $ 769.47 $ 26.00 $ 1,014.00 $ 45.00 $ 1,755.00 $ 40.00 $ 1,560.00

1035 2574.508 FERTILIZER TYPE 3 29.00 LB $ 3.00 $ 87.00 $ 1.00 $ 29.00 $ 2.00 $ 58.00 $ 1.35 $ 39.15 $ 1.35 $ 39.15 $ 1.30 $ 37.70 $ 2.00 $ 58.00

1036 2575.504 SODDING 700.00 SY $ 13.00 $ 9,100.00 $ 14.00 $ 9,800.00 $ 10.00 $ 7,000.00 $ 6.19 $ 4,333.00 $ 7.35 $ 5,145.00 $ 6.00 $ 4,200.00 $ 7.00 $ 4,900.00

1037 2575.504 RAPID STABILIZATION METHOD 2 350.00 SY $ 1.00 $ 350.00 $ 2.00 $ 700.00 $ 4.00 $ 1,400.00 $ 4.13 $ 1,445.50 $ 4.20 $ 1,470.00 $ 4.00 $ 1,400.00 $ 1.50 $ 525.00

1038 TOPSOIL PREPARATION 700.00 SY $ 5.00 $ 3,500.00 $ 1.00 $ 700.00 $ 5.00 $ 3,500.00 $ 3.77 $ 2,639.00 $ 5.75 $ 4,025.00 $ 1.00 $ 700.00 $ 6.00 $ 4,200.00

1039 TURF MAINTENANCE (5TH ST) 1.00 LS $ 7,500.00 $ 7,500.00 $ 0.01 $ 0.01 $ 2,500.00 $ 2,500.00 $ 103.24 $ 103.24 $ 105.00 $ 105.00 $ 100.00 $ 100.00 $ 100.00 $ 100.00

1040 2104.502 REMOVE HYDRANT 1.00 EACH $ 500.00 $ 500.00 $ 300.00 $ 300.00 $ 500.00 $ 500.00 $ 530.31 $ 530.31 $ 755.00 $ 755.00 $ 350.00 $ 350.00 $ 500.00 $ 500.00

1041 2104.503 REMOVE WATERMAIN PIPE 538.00 LF $ 8.00 $ 4,304.00 $ 10.00 $ 5,380.00 $ 5.00 $ 2,690.00 $ 5.30 $ 2,851.40 $ 5.00 $ 2,690.00 $ 1.00 $ 538.00 $ 7.00 $ 3,766.00

1042 2504.602 CONNECT TO EXIST WATERMAIN 2.00 EACH $ 1,600.00 $ 3,200.00 $ 3,000.00 $ 6,000.00 $ 1,500.00 $ 3,000.00 $ 1,389.89 $ 2,779.78 $ 1,600.00 $ 3,200.00 $ 1,500.00 $ 3,000.00 $ 1,800.00 $ 3,600.00

1043 2504.602 ADJUST VALVE BOX 2.00 EACH $ 300.00 $ 600.00 $ 500.00 $ 1,000.00 $ 500.00 $ 1,000.00 $ 286.76 $ 573.52 $ 295.00 $ 590.00 $ 350.00 $ 700.00 $ 250.00 $ 500.00

1044 2504.602 6" GATE VALVE & BOX 3.00 EACH $ 3,700.00 $ 11,100.00 $ 2,600.00 $ 7,800.00 $ 3,000.00 $ 9,000.00 $ 2,350.91 $ 7,052.73 $ 2,460.00 $ 7,380.00 $ 2,750.00 $ 8,250.00 $ 2,600.00 $ 7,800.00

1045 2504.603 6" PVC WATERMAIN 15.00 LF $ 75.00 $ 1,125.00 $ 50.00 $ 750.00 $ 60.00 $ 900.00 $ 100.11 $ 1,501.65 $ 65.00 $ 975.00 $ 70.00 $ 1,050.00 $ 98.00 $ 1,470.00

1046 2504.603 8" PVC WATERMAIN 520.00 LF $ 80.00 $ 41,600.00 $ 55.00 $ 28,600.00 $ 70.00 $ 36,400.00 $ 68.80 $ 35,776.00 $ 65.00 $ 33,800.00 $ 65.00 $ 33,800.00 $ 78.00 $ 40,560.00

1047 2504.602 HYDRANT (8' BURY) 1.00 EACH $ 6,500.00 $ 6,500.00 $ 8,000.00 $ 8,000.00 $ 7,500.00 $ 7,500.00 $ 6,352.31 $ 6,352.31 $ 7,065.00 $ 7,065.00 $ 6,500.00 $ 6,500.00 $ 7,600.00 $ 7,600.00

1048 2504.608 WATERMAIN FITTINGS 300.00 LB $ 18.00 $ 5,400.00 $ 15.00 $ 4,500.00 $ 15.00 $ 4,500.00 $ 15.26 $ 4,578.00 $ 15.00 $ 4,500.00 $ 15.00 $ 4,500.00 $ 19.00 $ 5,700.00

1049 WATERMAIN TRACER SYSTEM (5TH ST) 1.00 LS $ 1,500.00 $ 1,500.00 $ 0.01 $ 0.01 $ 3,000.00 $ 3,000.00 $ 720.20 $ 720.20 $ 425.00 $ 425.00 $ 1,000.00 $ 1,000.00 $ 1.00 $ 1.00

1050 2104.502 REMOVE MANHOLE OR CATCH BASIN 1.00 EACH $ 650.00 $ 650.00 $ 400.00 $ 400.00 $ 500.00 $ 500.00 $ 353.54 $ 353.54 $ 450.00 $ 450.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00

1051 2104.503 REMOVE SEWER PIPE (STORM) 85.00 LF $ 20.00 $ 1,700.00 $ 20.00 $ 1,700.00 $ 5.00 $ 425.00 $ 9.91 $ 842.35 $ 10.00 $ 850.00 $ 20.00 $ 1,700.00 $ 16.00 $ 1,360.00

1052 2503.602 CONNECT TO EXISTING STORM 2.00 EACH $ 1,250.00 $ 2,500.00 $ 1,000.00 $ 2,000.00 $ 1,000.00 $ 2,000.00 $ 964.02 $ 1,928.04 $ 1,220.00 $ 2,440.00 $ 1,500.00 $ 3,000.00 $ 1,300.00 $ 2,600.00

1053 2503.602 CONNECT TO EXISTING DRAINAGE STRUCTURE 1.00 EACH $ 1,250.00 $ 1,250.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,503.45 $ 1,503.45 $ 2,130.00 $ 2,130.00 $ 1,500.00 $ 1,500.00 $ 1,300.00 $ 1,300.00

1054 2503.603 18" PIPE SEWER 46.00 LF $ 70.00 $ 3,220.00 $ 85.00 $ 3,910.00 $ 100.00 $ 4,600.00 $ 76.57 $ 3,522.22 $ 56.30 $ 2,589.80 $ 55.00 $ 2,530.00 $ 200.00 $ 9,200.00

1055 2506.502 STORM SEWER CASTING ASSEMBLY 2.00 EACH $ 1,200.00 $ 2,400.00 $ 1,000.00 $ 2,000.00 $ 1,200.00 $ 2,400.00 $ 1,223.80 $ 2,447.60 $ 1,210.00 $ 2,420.00 $ 1,000.00 $ 2,000.00 $ 1,400.00 $ 2,800.00

1056 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL (R-1) 4.30 LF $ 750.00 $ 3,225.00 $ 665.00 $ 2,859.50 $ 800.00 $ 3,440.00 $ 486.41 $ 2,091.56 $ 450.00 $ 1,935.00 $ 375.00 $ 1,612.50 $ 440.00 $ 1,892.00

1057 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4022 5.20 LF $ 1,000.00 $ 5,200.00 $ 765.00 $ 3,978.00 $ 600.00 $ 3,120.00 $ 432.00 $ 2,246.40 $ 565.00 $ 2,938.00 $ 475.00 $ 2,470.00 $ 580.00 $ 3,016.00

1058 CONSTRUCTION ALLOWANCE (5TH ST) 6000.00 UNIT